Calculate the required surety bond amount for a Virginia Class A contractor with an average annual gross receipts of $2,500,000 over the past three years:
Correct Answer
A) $125,000
Virginia requires Class A contractors with gross receipts over $2,000,000 to maintain a surety bond of $125,000.
Why This Is the Correct Answer
The Virginia Board for Contractors uses a tiered surety bond schedule based on average annual gross receipts. Contractors with gross receipts exceeding $2,000,000 are required to maintain a $125,000 surety bond. With $2,500,000 in average annual gross receipts, this contractor falls into that highest tier, making $125,000 the correct bond amount.
Why the Other Options Are Wrong
Option B: $50,000
$50,000 corresponds to a lower gross receipts tier for Class A contractors (typically the entry-level tier). A contractor generating $2,500,000 annually has long outgrown that tier and must carry the higher bond amount.
Option C: $75,000
$75,000 is the bond amount for a middle tier (typically $500,001β$2,000,000 in gross receipts). At $2,500,000, the contractor has exceeded this tier and must move to the $125,000 bond.
Option D: $250,000
$250,000 overstates the requirement. No current Virginia Class A bond tier reaches $250,000; the maximum required bond is $125,000 for the highest gross receipts tier.
Memory Technique
Think of a staircase: Step 1 (lowest receipts) = $50K bond. Step 2 (middle) = $75K bond. Step 3 (top, over $2M) = $125K bond. $2.5M is on the top step β $125K.
More Virginia Questions
Under Virginia law (Title 54.1), what is the minimum net worth requirement for a Class A contractor license?
A Virginia contractor fails to pay a subcontractor $18,500 for completed work. Under Virginia mechanics lien law, within how many days must the subcontractor file a memorandum of lien to preserve their lien rights?
A Virginia contractor employs 8 workers with a total annual payroll of $420,000. Using the standard construction rate of $8.50 per $100 of payroll, what is the annual workers' compensation premium?
A Virginia contractor fails to pay subcontractors on a $180,000 project. Under Virginia mechanics lien law, what is the maximum time period a subcontractor has to file a mechanics lien after last furnishing labor or materials?
Under Virginia contractor law, what happens to a contractor's license if they fail to maintain required insurance coverage?
A contractor fails to pay a subcontractor and the subcontractor files a mechanics lien. Under Virginia law, within how many days must the general contractor post a bond to release the lien from the property?
A Class B contractor in Virginia completed $850,000 worth of work in the current license period and has contracts totaling $1,200,000 for the next period. What action must the contractor take?
A homeowner hired an unlicensed contractor for a $45,000 kitchen renovation. Under Virginia law, what remedy is available to the homeowner?
Calculate the required bond amount for a Virginia Class A contractor with average annual gross receipts of $2,800,000 over the past three years.
A Class C contractor in Virginia wants to install a residential HVAC system valued at $12,000. The contractor's specialty classification is electrical work. What must the contractor do to legally perform this work?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Project Management
60 questions Β· 70% to pass
Related Study Resources
Previous Question
The USBC requires a minimum ceiling height of 7 feet 6 inches for habitable rooms. A contractor is finishing a basement with floor joists that are 2Γ10 (9.25 inches actual depth). If the basement slab to bottom of joists measures 7 feet 8 inches, what is the maximum thickness allowed for the finished ceiling?
Next Question
A contractor fails to pay a subcontractor and the subcontractor files a mechanics lien. Under Virginia law, within how many days must the general contractor post a bond to release the lien from the property?