Calculate the annual workers' compensation cost for a contractor with 8 employees earning $45,000 each, with a rate of $8.25 per $100 of payroll:
Correct Answer
C) $29,700
Total payroll = 8 × $45,000 = $360,000. Premium = ($360,000 ÷ $100) × $8.25 = 3,600 × $8.25 = $29,700
Why This Is the Correct Answer
Total payroll = 8 × $45,000 = $360,000. Premium = ($360,000 ÷ $100) × $8.25 = 3,600 × $8.25 = $29,700. This is the standard workers' comp premium formula.
Why the Other Options Are Wrong
Option A: $31,500
$31,500 results from using an incorrect multiplier or miscomputing the number of $100 units (e.g., using $8.75 per $100 instead of $8.25).
Option B: $28,800
$28,800 likely comes from using a rate of $8.00 per $100 instead of $8.25, or from omitting one employee from the payroll calculation.
Option D: $30,600
$30,600 results from using a rate of $8.50 per $100 rather than $8.25, an off-by-one rounding error in the rate.
Memory Technique
Formula: (Total Payroll ÷ 100) × Rate. Step 1: employees × wage = total payroll. Step 2: total payroll ÷ 100 = payroll units. Step 3: payroll units × rate = premium.
More North Carolina Questions
A residential contractor in NC wants to bid on a $125,000 project but currently holds an Intermediate license. What action must be taken?
A contractor discovers contaminated soil during excavation on a commercial project in Charlotte. Under NC environmental regulations, what is the first required action?
A North Carolina contractor completes a $45,000 residential addition project. The homeowner refuses to pay the final $8,000. What is the filing deadline for a mechanic's lien under NC lien law?
A residential contractor in Charlotte is building a deck addition. Which inspection is typically required first under NC building codes?
A contractor performs work on a residential property in North Carolina but is not paid. The work was completed on March 15th, and the last material was delivered on March 20th. What is the deadline to file a claim of lien?
A subcontractor performing electrical work discovers that the general contractor's license has been suspended. What action should the subcontractor take according to NC General Statutes?
A contractor in North Carolina discovers contaminated soil during excavation. The soil contains petroleum products above reportable levels. Which agency must be notified immediately?
A contractor performing work on a North Carolina highway project encounters a suspected archaeological artifact. What is the required action under NC environmental regulations?
Calculate the workers' compensation premium for a NC roofing contractor with $250,000 in annual payroll and a rate of $18.50 per $100 of payroll:
Calculate the lien amount a subcontractor can claim on a $180,000 project where they provided $35,000 in materials and labor, but the general contractor still owes them $12,000: