According to Hawaii Building Code, what is the maximum spacing for ties in reinforced masonry construction in seismic zones?
Correct Answer
D) 16 inches on center
Hawaii's seismic requirements mandate 16-inch maximum spacing for ties in reinforced masonry to ensure adequate confinement and ductility during earthquake loading.
Why This Is the Correct Answer
The correct answer is 16 inches on center. Hawaii's seismic requirements mandate a maximum 16-inch tie spacing in reinforced masonry to provide adequate confinement of the vertical reinforcement and ensure ductile behavior during earthquake loading. Closer tie spacing prevents buckling of the vertical bars and maintains the integrity of the masonry cell during lateral seismic forces.
Why the Other Options Are Wrong
Option A: 48 inches on center
48 inches on center is far too wide a spacing for seismic zones. At 48 inches, the ties provide virtually no meaningful confinement of the reinforcement, allowing vertical bars to buckle under compressive loads generated during seismic events. This spacing might be seen in non-seismic, non-hurricane applications.
Option B: 32 inches on center
32 inches on center provides more confinement than 48 inches but still exceeds the Hawaii seismic requirement. In high-seismic regions like Hawaii, the code requires tighter spacing to ensure the masonry system can absorb and dissipate seismic energy without premature failure.
Option C: 24 inches on center
24 inches on center is closer to the correct answer and may reflect requirements in lower seismic zones or standard masonry construction. However, Hawaii's combined seismic and hurricane loading demands the tighter 16-inch requirement for reinforced masonry in seismic zones.
Memory Technique
16 inches = one standard concrete block height (masonry courses run approximately 8 inches; 16 inches = every other course). Think of placing a tie at every other masonry course β that is the visual anchor for 16-inch seismic tie spacing in Hawaii.
More Hawaii Questions
A concrete mix design for coastal construction specifies a water-cement ratio of 0.40. If 650 lbs of cement is used per cubic yard, how many gallons of water should be added?
A contractor is installing hurricane straps rated at 1,500 pounds each. If the calculated uplift force on a rafter is 3,200 pounds, how many straps are required with a 2.0 safety factor?
Hawaii Building Code requires special inspection for concrete placement in seismic design categories. What is the minimum frequency for concrete strength testing?
What is the maximum allowable deflection for roof rafters under design wind loads in Hawaii's hurricane zones?
Which roofing attachment method is specifically required in Hawaii's hurricane zones for asphalt shingles on residential construction?
A building in Maui requires hurricane straps rated for 175 mph winds. If each strap must resist 1,200 lbs of uplift force and you have 48 roof-to-wall connections, what is the total uplift resistance provided?
During construction of a beachfront property, you notice white crystalline deposits forming on the concrete surface. This indicates:
You discover expansive clay soil conditions during excavation for a residential foundation in Kona. The plasticity index is 28. What foundation system is most appropriate?
According to Hawaii building requirements, hurricane straps connecting roof trusses to wall plates must be rated for what minimum uplift force in high wind zones?
A concrete slab foundation in Hawaii requires a vapor barrier. Due to high humidity and frequent rainfall, what type of vapor barrier is most appropriate?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Project Management
60 questions Β· 70% to pass
Related Study Resources
Previous Question
A roof in Hawaii's 150 mph wind zone requires uplift resistance. If the roof area is 2,000 sq ft and design uplift pressure is 45 psf, what total uplift force must the connection system resist?
Next Question
A contractor finds evidence of Formosan termites during construction. According to Hawaii pest control regulations, what type of treatment is typically required?