A contractor is working near a Louisiana wetland area. The project requires filling 0.8 acres of wetlands. What federal and state permits are likely required?

Correct Answer

A) Both federal Section 404 and Louisiana Water Quality Certification

Wetland filling requires both federal Section 404 permits from Army Corps of Engineers and Louisiana Water Quality Certification, regardless of size.

Answer Options
A
Both federal Section 404 and Louisiana Water Quality Certification
B
No permits required for areas under 1 acre
C
Only U.S. Army Corps of Engineers Section 404 permit
D
Only Louisiana Wetlands Permit

Why This Is the Correct Answer

Filling wetlands — regardless of acreage — triggers a dual-permit requirement: (1) a federal Section 404 permit from the U.S. Army Corps of Engineers under the Clean Water Act, which regulates the discharge of dredged or fill material into navigable waters and adjacent wetlands, and (2) a Louisiana Water Quality Certification (Section 401 certification) issued by LDEQ, which ensures the activity meets state water quality standards. There is no minimum-acreage exemption for this combined requirement.

Why the Other Options Are Wrong

Option B: No permits required for areas under 1 acre

There is no '1-acre exemption' for wetland fill permits under federal or Louisiana law. Even minor fills below 0.1 acre often require a Nationwide Permit (a streamlined Section 404 authorization). Size may affect the type of permit pathway, but it never eliminates the permit requirement altogether.

Option C: Only U.S. Army Corps of Engineers Section 404 permit

A Section 404 permit alone is insufficient. Federal law (Section 401 of the Clean Water Act) explicitly requires that any federally licensed activity that may result in a discharge to waters of the United States must obtain a state water quality certification. Louisiana's certification process is administered by LDEQ and is a separate, mandatory step.

Option D: Only Louisiana Wetlands Permit

Louisiana does not have a standalone 'Louisiana Wetlands Permit' that substitutes for the federal Section 404 process. The state's role is the 401 Water Quality Certification, which works in conjunction with — not instead of — the federal permit.

Memory Technique

Think '404 + 401' — the Corps issues the 404 fill permit, and the state issues its 401 Water Quality Certification. Two numbers, two agencies, always both required.

Was this explanation helpful?

More Louisiana Questions

A contractor in Louisiana completes $85,000 worth of work on a residential project. The owner pays $70,000 but disputes the remaining $15,000. If the contractor files a lien claim, what percentage penalty can be awarded if the contractor prevails in court?

A contractor discovers contaminated soil during excavation that requires special disposal. The disposal cost is $12,000, and transportation is $3,500. If this was not foreseeable from the contract documents, who typically bears this cost under Louisiana law?

A construction worker is injured on a Louisiana job site. The contractor's workers' compensation carrier has 15 days to investigate. If they don't respond within this period, what happens to the claim?

Under Louisiana law, what is the minimum amount of workers' compensation insurance coverage required for construction contractors?

A contractor's employee is injured on a job site in Louisiana. The contractor has workers' compensation insurance. Which statement is correct regarding the employee's rights?

Under Louisiana Civil Code, if a building contract does not specify a completion date, when is the work considered to be due?

Under Louisiana building codes, what is the minimum width required for emergency egress windows in bedrooms?

A Class B contractor in Louisiana wants to bid on a project worth $175,000. What action must they take?

A contractor's worker is injured and files for workers' compensation. The injury occurred due to the worker's intoxication. Under Louisiana law, what is the likely outcome?

A general contractor discovers contaminated soil during excavation for a commercial project in Louisiana. Which state agency must be notified?

People Also Study

Related Study Resources

Practice More Contractor Exam Questions

Access all practice questions with progress tracking and adaptive difficulty to pass your contractor license exam.

Start Practicing

Disclaimer: EstatePass is an independent exam preparation platform and is not affiliated with, endorsed by, or connected to any state contractor licensing board, the Construction Industry Licensing Board (CILB), the Department of Business and Professional Regulation (DBPR), NASCLA, Pearson VUE, PSI, or any government agency. Exam requirements, fees, and regulations change frequently. Always verify current requirements with your state's licensing board before making decisions. Information shown was last verified on the dates indicated and may not reflect the most recent changes.