A contractor discovers active termite damage during renovation work in Hawaii. According to state requirements, what immediate action is required?
Correct Answer
D) Stop work and notify the building department
Active termite damage discovery requires work stoppage and notification to the building department for proper inspection and treatment requirements before continuing construction.
Why This Is the Correct Answer
Hawaii state requirements mandate that a contractor who discovers active termite damage must immediately stop work and notify the building department. Hawaii has some of the most aggressive termite populations in the U.S. (particularly Formosan subterranean termites), and active infestation during construction requires official inspection before work can resume to ensure structural integrity is properly evaluated.
Why the Other Options Are Wrong
Option A: Treat visible areas and continue
Treating visible areas and continuing work does not comply with Hawaii's requirements. Surface treatment without official inspection may miss the full extent of structural damage, creating safety hazards and legal liability for the contractor.
Option B: Document damage and notify property owner only
Notifying only the property owner, without stopping work or contacting the building department, does not fulfill the contractor's regulatory obligation. The building department must be involved to ensure proper inspection and compliance.
Option C: Continue work and treat at completion
Continuing work and treating at completion is not acceptable under Hawaii state requirements. Active termite damage may compromise structural elements currently being built upon, creating an unsafe condition that cannot be deferred until project completion.
Memory Technique
Termites in Hawaii = Stop + Call. Stop work, call the building department. Think: termites are a stop sign in Hawaii β you must halt and report officially.
More Hawaii Questions
A concrete mix design for coastal construction specifies a water-cement ratio of 0.40. If 650 lbs of cement is used per cubic yard, how many gallons of water should be added?
A contractor is installing hurricane straps rated at 1,500 pounds each. If the calculated uplift force on a rafter is 3,200 pounds, how many straps are required with a 2.0 safety factor?
Hawaii Building Code requires special inspection for concrete placement in seismic design categories. What is the minimum frequency for concrete strength testing?
What is the maximum allowable deflection for roof rafters under design wind loads in Hawaii's hurricane zones?
Which roofing attachment method is specifically required in Hawaii's hurricane zones for asphalt shingles on residential construction?
A building in Maui requires hurricane straps rated for 175 mph winds. If each strap must resist 1,200 lbs of uplift force and you have 48 roof-to-wall connections, what is the total uplift resistance provided?
During construction of a beachfront property, you notice white crystalline deposits forming on the concrete surface. This indicates:
You discover expansive clay soil conditions during excavation for a residential foundation in Kona. The plasticity index is 28. What foundation system is most appropriate?
According to Hawaii building requirements, hurricane straps connecting roof trusses to wall plates must be rated for what minimum uplift force in high wind zones?
A concrete slab foundation in Hawaii requires a vapor barrier. Due to high humidity and frequent rainfall, what type of vapor barrier is most appropriate?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Project Management
60 questions Β· 70% to pass
Related Study Resources
Previous Question
For a 2,400 square foot roof in a hurricane zone, if the code requires 45 psf uplift resistance and safety factor of 2.0, what total uplift force must the roof system resist?
Next Question