A concrete slab foundation is being poured on Oahu volcanic soil with a bearing capacity of 2,000 psf. What is the minimum thickness required for a slab supporting a total load of 150 psf over a 20' x 30' area?
Correct Answer
B) 6 inches
For volcanic soils in Hawaii, minimum slab thickness is typically 6 inches to handle differential settlement and provide adequate structural integrity, regardless of the load calculation.
Why This Is the Correct Answer
Even though the bearing capacity calculation might suggest a thinner slab is structurally adequate for the given load, Hawaii's volcanic soils require a minimum 6-inch slab thickness as a code baseline. Volcanic soils are subject to differential settlement due to irregular rock formations and voids, so the minimum thickness provides the necessary structural continuity and rigidity to bridge inconsistencies in the substrate.
Why the Other Options Are Wrong
Option A: 4 inches
A 4-inch slab is the minimum for light-duty applications on uniform, stable soil conditions. Hawaii's volcanic soil conditions and the code's recognition of differential settlement risk require a greater minimum thickness regardless of load calculations.
Option C: 10 inches
10 inches exceeds the minimum requirement for the given conditions. While heavier loads or weaker soils might justify 10 inches, the scenario with 2,000 psf bearing capacity does not warrant this thickness as the minimum.
Option D: 8 inches
8 inches is greater than the required minimum of 6 inches for this condition. It may be appropriate for heavier loads or specific structural requirements, but it is not the minimum mandated for this scenario.
Memory Technique
In Hawaii, think 'Six-inch Shield' β the 6-inch slab acts as a shield against the unpredictable voids and differential settlement in volcanic soil. Six is the floor, not the ceiling.
More Hawaii Questions
A concrete mix design for coastal construction specifies a water-cement ratio of 0.40. If 650 lbs of cement is used per cubic yard, how many gallons of water should be added?
A contractor is installing hurricane straps rated at 1,500 pounds each. If the calculated uplift force on a rafter is 3,200 pounds, how many straps are required with a 2.0 safety factor?
Hawaii Building Code requires special inspection for concrete placement in seismic design categories. What is the minimum frequency for concrete strength testing?
What is the maximum allowable deflection for roof rafters under design wind loads in Hawaii's hurricane zones?
Which roofing attachment method is specifically required in Hawaii's hurricane zones for asphalt shingles on residential construction?
A building in Maui requires hurricane straps rated for 175 mph winds. If each strap must resist 1,200 lbs of uplift force and you have 48 roof-to-wall connections, what is the total uplift resistance provided?
During construction of a beachfront property, you notice white crystalline deposits forming on the concrete surface. This indicates:
You discover expansive clay soil conditions during excavation for a residential foundation in Kona. The plasticity index is 28. What foundation system is most appropriate?
According to Hawaii building requirements, hurricane straps connecting roof trusses to wall plates must be rated for what minimum uplift force in high wind zones?
A concrete slab foundation in Hawaii requires a vapor barrier. Due to high humidity and frequent rainfall, what type of vapor barrier is most appropriate?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Project Management
60 questions Β· 70% to pass
Related Study Resources
Previous Question
In Hawaii's coastal environment, what is the primary reason for using epoxy-coated reinforcing steel in concrete construction?
Next Question
Hawaii Building Code requires termite protection for all wood construction. What is the standard soil treatment depth around building perimeters?