A commercial contractor's license classification allows work up to $150,000 per project. The contractor bids on a $175,000 project. What action is required?
Correct Answer
A) Must upgrade license classification
The contractor must upgrade to a higher license classification that allows projects exceeding $150,000 before bidding on or performing the $175,000 project.
Why This Is the Correct Answer
Option A is correct. A contractor's license classification establishes the maximum project value they are authorized to undertake. To legally bid on or perform work exceeding that limit, the contractor must obtain a higher license classification from the Louisiana State Licensing Board for Contractors (LSLBC) before proceeding. Performing work beyond the licensed scope is a violation of Louisiana contractor licensing law.
Why the Other Options Are Wrong
Option B: Must obtain special project permit
Option B (obtain a special project permit) is not a recognized mechanism under Louisiana contractor licensing law. There is no 'special project permit' that allows a contractor to exceed their classification limit on a one-off basis. The proper remedy is upgrading the license classification.
Option C: Must partner with higher-classified contractor
Option C (partner with a higher-classified contractor) may be a practical business arrangement in some contexts, but it does not automatically authorize the under-classified contractor to bid or perform the work. Louisiana law requires the contractor of record to hold the appropriate classification for the project value.
Option D: May proceed with current license
Option D (may proceed with current license) is incorrect and legally dangerous. Proceeding with a $175,000 project under a $150,000 classification limit would constitute unlicensed contracting for that scope, exposing the contractor to license suspension, fines, and civil liability.
Memory Technique
Think of a license classification like a speed limit: if the limit is $150,000 and you're going $175,000, you're speeding. The fix is not a special pass β it's getting a license for the higher speed (upgrading your classification).
More Louisiana Questions
A contractor in Louisiana completes $85,000 worth of work on a residential project. The owner pays $70,000 but disputes the remaining $15,000. If the contractor files a lien claim, what percentage penalty can be awarded if the contractor prevails in court?
A contractor discovers contaminated soil during excavation that requires special disposal. The disposal cost is $12,000, and transportation is $3,500. If this was not foreseeable from the contract documents, who typically bears this cost under Louisiana law?
A construction worker is injured on a Louisiana job site. The contractor's workers' compensation carrier has 15 days to investigate. If they don't respond within this period, what happens to the claim?
Under Louisiana law, what is the minimum amount of workers' compensation insurance coverage required for construction contractors?
A contractor's employee is injured on a job site in Louisiana. The contractor has workers' compensation insurance. Which statement is correct regarding the employee's rights?
Under Louisiana Civil Code, if a building contract does not specify a completion date, when is the work considered to be due?
Under Louisiana building codes, what is the minimum width required for emergency egress windows in bedrooms?
A Class B contractor in Louisiana wants to bid on a project worth $175,000. What action must they take?
A contractor's worker is injured and files for workers' compensation. The injury occurred due to the worker's intoxication. Under Louisiana law, what is the likely outcome?
A general contractor discovers contaminated soil during excavation for a commercial project in Louisiana. Which state agency must be notified?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Project Management
60 questions Β· 70% to pass