A building site in Hawaii has been identified as having 'a'a lava rock substrate. What special consideration is required for foundation design?
Correct Answer
C) Increased excavation costs and rock anchoring systems
'A'a lava rock is extremely hard and requires specialized equipment for excavation, and foundations may need rock anchoring systems for proper attachment.
Why This Is the Correct Answer
'A'a lava has a rough, clinkery, extremely hard surface that is very difficult to excavate with standard equipment. Specialized rock-breaking equipment (hydraulic hammers, blasting in some cases) is required, significantly increasing excavation costs. Additionally, foundations set in 'a'a lava may need rock anchoring systems (epoxy-set rebar or mechanical anchors drilled into the rock) to achieve proper connection between the concrete foundation and the substrate.
Why the Other Options Are Wrong
Option A: No special requirements needed
No special requirements is incorrect. 'A'a lava presents unique construction challenges that must be addressed in the foundation design. Ignoring the substrate type would lead to inadequate excavation methods, potential foundation instability, and permit non-compliance.
Option B: Deeper foundations due to poor bearing capacity
Deeper foundations due to poor bearing capacity is incorrect. 'A'a lava actually has excellent bearing capacity β it is extremely hard rock. The issue is not bearing capacity or depth, but rather the difficulty of excavating the material and anchoring to it properly.
Option D: Special drainage for unstable soil
Special drainage for unstable soil confuses 'a'a lava with soft or clay soils. 'A'a lava is not unstable, nor does it require drainage in the same sense as expansive or waterlogged soils. Drainage may be a secondary consideration for surface water, but it is not the primary special requirement for 'a'a lava foundations.
Memory Technique
The name ''a'a' sounds like what you'd yell when you try to dig through it with a regular shovel β it's painfully hard! Remember: 'a'a = Agonizing excavation, Anchoring required.
More Hawaii Questions
A concrete mix design for coastal construction specifies a water-cement ratio of 0.40. If 650 lbs of cement is used per cubic yard, how many gallons of water should be added?
A contractor is installing hurricane straps rated at 1,500 pounds each. If the calculated uplift force on a rafter is 3,200 pounds, how many straps are required with a 2.0 safety factor?
Hawaii Building Code requires special inspection for concrete placement in seismic design categories. What is the minimum frequency for concrete strength testing?
What is the maximum allowable deflection for roof rafters under design wind loads in Hawaii's hurricane zones?
Which roofing attachment method is specifically required in Hawaii's hurricane zones for asphalt shingles on residential construction?
A building in Maui requires hurricane straps rated for 175 mph winds. If each strap must resist 1,200 lbs of uplift force and you have 48 roof-to-wall connections, what is the total uplift resistance provided?
During construction of a beachfront property, you notice white crystalline deposits forming on the concrete surface. This indicates:
You discover expansive clay soil conditions during excavation for a residential foundation in Kona. The plasticity index is 28. What foundation system is most appropriate?
According to Hawaii building requirements, hurricane straps connecting roof trusses to wall plates must be rated for what minimum uplift force in high wind zones?
A concrete slab foundation in Hawaii requires a vapor barrier. Due to high humidity and frequent rainfall, what type of vapor barrier is most appropriate?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Project Management
60 questions Β· 70% to pass
Related Study Resources
Previous Question
A residential roof replacement project in Lahaina requires hurricane-rated shingles. Calculate the required nail penetration depth for 7/16-inch OSB sheathing with architectural shingles.
Next Question
A concrete slab in Honolulu requires 4,200 cubic feet of concrete. If the specified mix design calls for 6.5 sacks of cement per cubic yard, how many sacks of cement are needed for this project?