EstatePass
epa-608-type-3Purge Units & Leak Controlmedium

Besides a leak in the shell, what commonly loads a low-pressure machine with non-condensable gas?

Correct Answer

A) Careless service work that leaves the machine standing open to the room

Every hour a machine stands open, or every hose connected without purging the air out of it, adds non-condensable gas that the purge unit will have to remove afterward. On a machine that will be pulled into a deep vacuum this is manageable, but only if the technician evacuates properly before charging. Skipping that step hands the purge unit a load it was never sized for, and the plant sees the result as elevated purge run time and refrigerant loss for months.

Answer Options
A
Careless service work that leaves the machine standing open to the room
B
Operating the chiller at part load for extended periods each year
C
Charging the machine slightly above its nameplate refrigerant weight on the plate
D
Using a heavier grade of oil than the manufacturer specified on refill

Why This Is the Correct Answer

Service work is a major source of air in these machines: open manways, unpurged hoses, gauge lines and repeated connections all admit room air. Proper evacuation after the work and disciplined hose purging during charging are what keep that air from becoming the purge unit's permanent burden.

Why the Other Options Are Wrong

Option B: Operating the chiller at part load for extended periods each year

Part load operation affects efficiency and surge behavior but introduces no non-condensable gas. A machine can run lightly loaded for years with a purge unit that barely cycles.

Option C: Charging the machine slightly above its nameplate refrigerant weight on the plate

A slight overcharge changes liquid levels and head pressure but adds refrigerant, not air. The purge unit has nothing extra to remove, since refrigerant condenses normally in the condenser.

Option D: Using a heavier grade of oil than the manufacturer specified on refill

The wrong oil grade causes lubrication and oil return problems rather than air in the condenser. Oil trouble shows up as bearing temperature and oil return symptoms, not as rising purge run time.

Memory Technique

The biggest hole in the machine is the one you opened. Close it, evacuate it, then charge it.

Reference Hint

Air enters low-pressure machines through service work as well as leaks, which is why full evacuation is required before recharging.

Was this explanation helpful?

More epa-608-type-3 Questions

People Also Study

Related Study Resources

Practice More Contractor Exam Questions

Access all practice questions with progress tracking and adaptive difficulty to pass your contractor license exam.

Start Practicing

Disclaimer: EstatePass is an independent exam preparation platform and is not affiliated with, endorsed by, or connected to any state contractor licensing board, the Construction Industry Licensing Board (CILB), the Department of Business and Professional Regulation (DBPR), NASCLA, Pearson VUE, PSI, or any government agency. Exam requirements, fees, and regulations change frequently. Always verify current requirements with your state's licensing board before making decisions. Information shown was last verified on the dates indicated and may not reflect the most recent changes.