Class B TradeSafetymedium17% of exam part

Saw slurry is rinsed across a sidewalk toward the curb inlet. What should be provided?

Correct Answer

B) Slurry containment.

Contain and collect slurry rather than washing it into a storm drain. Caltrans section 13-4.03 E(7) addresses capture and removal of cutting/grinding residue; determine the applicable project requirements. Source: https://dot.ca.gov/-/media/dot-media/programs/design/documents/2025_stdspecs.pdf

Answer Options
A
Shade access.
B
Slurry containment.
C
Signal confusion.
D
Stability and view.

Why This Is the Correct Answer

Contain and collect slurry rather than washing it into a storm drain. Caltrans section 13-4.03 E(7) addresses capture and removal of cutting/grinding residue; determine the applicable project requirements. Source: https://dot.ca.gov/-/media/dot-media/programs/design/documents/2025_stdspecs.pdf

Independent practice; verify any reference hint against the edition and category permitted for your booking. Official exam and reference-list sources →

Was this explanation helpful?

More Class B Trade Questions

People Also Study

Related Study Resources

Practice More Contractor Exam Questions

Access all practice questions with progress tracking and adaptive difficulty to pass your contractor license exam.

Start Practicing

Disclaimer: EstatePass is an independent exam preparation platform and is not affiliated with, endorsed by, or connected to any state contractor licensing board, the Construction Industry Licensing Board (CILB), the Department of Business and Professional Regulation (DBPR), NASCLA, Pearson VUE, PSI, or any government agency. Exam requirements, fees, and regulations change frequently. Always verify current requirements with your state's licensing board before making decisions. Information shown was last verified on the dates indicated and may not reflect the most recent changes.