A crew is cutting concrete dry inside a remodel space and visible dust fills the room. What is the best first safety control?

Correct Answer

A) Use wet cutting or local exhaust.

Concrete cutting can expose workers to respirable dust; engineering controls such as wet methods or local exhaust should be used before relying only on cleanup.

Answer Options
A
Use wet cutting or local exhaust.
B
Open the windows and run a box fan to push the dust outside.
C
Have workers wear cloth face coverings and keep cutting dry.
D
Wait and dry-sweep the settled dust at the end of the shift.

Why This Is the Correct Answer

Concrete cutting can expose workers to respirable dust; engineering controls such as wet methods or local exhaust should be used before relying only on cleanup.

Was this explanation helpful?

More ca-trade-b Questions

People Also Study

Related Study Resources

Practice More Contractor Exam Questions

Access all practice questions with progress tracking and adaptive difficulty to pass your Florida General Contractor exam.

Start Practicing

Disclaimer: EstatePass is an independent exam preparation platform and is not affiliated with, endorsed by, or connected to any state contractor licensing board, the Construction Industry Licensing Board (CILB), the Department of Business and Professional Regulation (DBPR), NASCLA, Pearson VUE, PSI, or any government agency. Exam requirements, fees, and regulations change frequently. Always verify current requirements with your state's licensing board before making decisions. Information shown was last verified on the dates indicated and may not reflect the most recent changes.