A note says to verify the existing ceiling height before ordering tall cabinets. What does that mean for procurement?

Correct Answer

D) Measure before ordering.

A verify-in-field note means the contractor should confirm actual dimensions before fabrication or procurement.

Answer Options
A
Order from the catalog without measuring.
B
Carry the estimate unchanged where a note says to verify the existing ceiling height before ordering tall cabinets, and sort out the scope effect after award.
C
Use the old drawing or assumption even though the a note says to verify the existing ceiling height before ordering tall cabinets item may affect labor, materials, or sequencing.
D
Measure before ordering.

Why This Is the Correct Answer

A verify-in-field note means the contractor should confirm actual dimensions before fabrication or procurement.

Why the Other Options Are Wrong

Option A: Order from the catalog without measuring.

Order from the catalog without measuring. does not satisfy the required party, deadline, proof, license, bond, insurance, or agency trigger for field verification.

Option B: Carry the estimate unchanged where a note says to verify the existing ceiling height before ordering tall cabinets, and sort out the scope effect after award.

Carry the estimate unchanged where a note says to verify the existing ceiling height before ordering tall cabinets, and sort out the scope effect after award. does not satisfy the required party, deadline, proof, license, bond, insurance, or agency trigger for field verification.

Option C: Use the old drawing or assumption even though the a note says to verify the existing ceiling height before ordering tall cabinets item may affect labor, materials, or sequencing.

Use the old drawing or assumption even though the a note says to verify the existing ceiling height before ordering tall cabinets item may affect labor, materials, or sequencing. does not satisfy the required party, deadline, proof, license, bond, insurance, or agency trigger for field verification.

Memory Technique

Field Verification clock for Cabinets Remodel: party, date, proof, then rights.

Reference Hint

Study anchor (closed-book): memorize Field verification from CSLB B General Building Study Guide; California Building Code, Title. / CSLB B General Building Study Guide site verification; know the rule or calculation trigger without relying on exam-room lookup.

Was this explanation helpful?

More Class B Trade Questions

People Also Study

Related Study Resources

Practice More Contractor Exam Questions

Access all practice questions with progress tracking and adaptive difficulty to pass your contractor license exam.

Start Practicing

Disclaimer: EstatePass is an independent exam preparation platform and is not affiliated with, endorsed by, or connected to any state contractor licensing board, the Construction Industry Licensing Board (CILB), the Department of Business and Professional Regulation (DBPR), NASCLA, Pearson VUE, PSI, or any government agency. Exam requirements, fees, and regulations change frequently. Always verify current requirements with your state's licensing board before making decisions. Information shown was last verified on the dates indicated and may not reflect the most recent changes.