A deck ledger is fastened through stucco only, with no verified connection to structural framing. What must be corrected?
Correct Answer
B) The ledger’s load-bearing connection to adequate structural support.
Restore a verified connection from the ledger to adequate structural support. Attachment to cladding alone does not establish the required deck support; also preserve the applicable water-management detail. Source: https://seblog.strongtie.com/2019/09/questions-answered-deck-ledger-connections-for-wood-and-masonry/
Why This Is the Correct Answer
Restore a verified connection from the ledger to adequate structural support. Attachment to cladding alone does not establish the required deck support; also preserve the applicable water-management detail. Source: https://seblog.strongtie.com/2019/09/questions-answered-deck-ledger-connections-for-wood-and-masonry/
Independent practice; verify any reference hint against the edition and category permitted for your booking. Official exam and reference-list sources →
More Class B Trade Questions
An attic furnace platform blocks required access to service panels. What should be maintained?
A panel edge called out for blocking in the structural notes is left unsupported. What should be installed?
A new dwelling laundry area has a 125-volt, 20-ampere receptacle supplied by a 120-volt single-phase circuit, without required personnel ground-fault interruption. Which protection is missing?
Which listed hazard is directly increased by carrying a forklift load high while traveling through a doorway?
A penetration through a rated gypsum wall is patched with ordinary joint compound only. What must be maintained?
A shear wall panel is installed but the specified edge nailing is missing at panel edges. What is the issue?
A service panel is installed where stored material blocks the working area. What must be maintained?
A fire-rated wall patch is finished with standard materials without matching the tested assembly. What must be preserved?
A joist hanger is installed with drywall screws instead of the fasteners specified by the hardware manufacturer. What should be corrected?
A field change includes 28 added labor-hours at $69 per hour plus $880 in material. What direct cost should be priced before markup?
People Also Study
Related Study Resources
Previous Question
Sixteen outdoor workers have a five-hour task with no continuous water supply or replenishment. Using one quart available per worker per hour, how many quarts are needed?
Next Question
A rectangular roof plane measures 42 feet by 24 feet along its actual surface. How many roofing squares does it contain before waste?