A deck ledger is bolted to a thin rim board that is not designed to carry the ledger load. What should be verified?
Correct Answer
B) The capacity and continuity of the ledger’s structural support and connection.
Confirm that the ledger connects to members and connections capable of carrying the deck reactions, or provide an approved alternative support system. More bolts alone cannot verify an unsuitable supporting rim. Source: https://seblog.strongtie.com/2019/09/questions-answered-deck-ledger-connections-for-wood-and-masonry/
Why This Is the Correct Answer
Confirm that the ledger connects to members and connections capable of carrying the deck reactions, or provide an approved alternative support system. More bolts alone cannot verify an unsuitable supporting rim. Source: https://seblog.strongtie.com/2019/09/questions-answered-deck-ledger-connections-for-wood-and-masonry/
Independent practice; verify any reference hint against the edition and category permitted for your booking. Official exam and reference-list sources →
More Class B Trade Questions
An attic furnace platform blocks required access to service panels. What should be maintained?
A panel edge called out for blocking in the structural notes is left unsupported. What should be installed?
A new dwelling laundry area has a 125-volt, 20-ampere receptacle supplied by a 120-volt single-phase circuit, without required personnel ground-fault interruption. Which protection is missing?
Which listed hazard is directly increased by carrying a forklift load high while traveling through a doorway?
A penetration through a rated gypsum wall is patched with ordinary joint compound only. What must be maintained?
A shear wall panel is installed but the specified edge nailing is missing at panel edges. What is the issue?
A service panel is installed where stored material blocks the working area. What must be maintained?
A fire-rated wall patch is finished with standard materials without matching the tested assembly. What must be preserved?
A joist hanger is installed with drywall screws instead of the fasteners specified by the hardware manufacturer. What should be corrected?
A field change includes 28 added labor-hours at $69 per hour plus $880 in material. What direct cost should be priced before markup?
People Also Study
Related Study Resources
Previous Question
A casework estimate has 24 linear feet of cabinets and a stated installation-labor rate of $82 per linear foot. What labor amount results before any separately priced additions?
Next Question
Sixteen outdoor workers have a five-hour task with no continuous water supply or replenishment. Using one quart available per worker per hour, how many quarts are needed?