A roof-to-wall uplift connector shown on the plan is omitted at several rafters. What is missing?
Correct Answer
C) The specified roof-to-wall uplift connection.
The plan calls for a connection carrying roof uplift into the wall system. The omitted connectors leave that specified connection incomplete; a different solution requires an approved design. Source: https://seblog.strongtie.com/2016/07/select-connector-series-hurricane-tie/
Why This Is the Correct Answer
The plan calls for a connection carrying roof uplift into the wall system. The omitted connectors leave that specified connection incomplete; a different solution requires an approved design. Source: https://seblog.strongtie.com/2016/07/select-connector-series-hurricane-tie/
Independent practice; verify any reference hint against the edition and category permitted for your booking. Official exam and reference-list sources →
More Class B Trade Questions
An attic furnace platform blocks required access to service panels. What should be maintained?
A panel edge called out for blocking in the structural notes is left unsupported. What should be installed?
A new dwelling laundry area has a 125-volt, 20-ampere receptacle supplied by a 120-volt single-phase circuit, without required personnel ground-fault interruption. Which protection is missing?
Which listed hazard is directly increased by carrying a forklift load high while traveling through a doorway?
A penetration through a rated gypsum wall is patched with ordinary joint compound only. What must be maintained?
A shear wall panel is installed but the specified edge nailing is missing at panel edges. What is the issue?
A service panel is installed where stored material blocks the working area. What must be maintained?
A fire-rated wall patch is finished with standard materials without matching the tested assembly. What must be preserved?
A joist hanger is installed with drywall screws instead of the fasteners specified by the hardware manufacturer. What should be corrected?
A field change includes 28 added labor-hours at $69 per hour plus $880 in material. What direct cost should be priced before markup?
People Also Study
Related Study Resources
Previous Question
Flooring for a 28-foot by 12-foot room is priced at $8.10 per square foot, and the takeoff carries 7 percent waste. What material cost should be estimated?
Next Question
A floor drain in a seldom-used utility room has no provision to keep the trap from drying out. What should be addressed?