EstatePass
Class B TradeFraming & Structuralmedium20% of exam part

A deck ledger has no flashing where it meets the exterior wall. What problem is the flashing intended to prevent?

Correct Answer

C) Water intrusion at the wall.

Flashing integrated with the wall drainage plane directs water away from the deck connection and its penetrations. It addresses water entry, not structural fastener capacity. Source: https://buildingscience.com/documents/information-sheets/integrating-deck-ledger-board-with-drainage-plane

Answer Options
A
Insufficient bearing area at the deck posts.
B
Insufficient joist bending capacity.
C
Water intrusion at the wall.
D
Inadequate lateral restraint at the guard posts.

Why This Is the Correct Answer

Flashing integrated with the wall drainage plane directs water away from the deck connection and its penetrations. It addresses water entry, not structural fastener capacity. Source: https://buildingscience.com/documents/information-sheets/integrating-deck-ledger-board-with-drainage-plane

Independent practice; verify any reference hint against the edition and category permitted for your booking. Official exam and reference-list sources →

Was this explanation helpful?

More Class B Trade Questions

People Also Study

Related Study Resources

Practice More Contractor Exam Questions

Access all practice questions with progress tracking and adaptive difficulty to pass your contractor license exam.

Start Practicing

Disclaimer: EstatePass is an independent exam preparation platform and is not affiliated with, endorsed by, or connected to any state contractor licensing board, the Construction Industry Licensing Board (CILB), the Department of Business and Professional Regulation (DBPR), NASCLA, Pearson VUE, PSI, or any government agency. Exam requirements, fees, and regulations change frequently. Always verify current requirements with your state's licensing board before making decisions. Information shown was last verified on the dates indicated and may not reflect the most recent changes.