A new circuit is added, but the panel directory says only 'miscellaneous.' What should be provided?
Correct Answer
A) Clear, durable identification of the loads or areas served by each circuit.
Provide durable, legible identification that makes each circuit’s purpose clear. Repeating “misc.” does not identify otherwise unclear loads. Title 8 section 2340.22(b) and (d) addresses circuit identification and durability of the markings. Source: https://www.dir.ca.gov/title8/2340_22.html
Why This Is the Correct Answer
Provide durable, legible identification that makes each circuit’s purpose clear. Repeating “misc.” does not identify otherwise unclear loads. Title 8 section 2340.22(b) and (d) addresses circuit identification and durability of the markings. Source: https://www.dir.ca.gov/title8/2340_22.html
Independent practice; verify any reference hint against the edition and category permitted for your booking. Official exam and reference-list sources →
More Class B Trade Questions
An attic furnace platform blocks required access to service panels. What should be maintained?
A panel edge called out for blocking in the structural notes is left unsupported. What should be installed?
A new dwelling laundry area has a 125-volt, 20-ampere receptacle supplied by a 120-volt single-phase circuit, without required personnel ground-fault interruption. Which protection is missing?
Which listed hazard is directly increased by carrying a forklift load high while traveling through a doorway?
A penetration through a rated gypsum wall is patched with ordinary joint compound only. What must be maintained?
A shear wall panel is installed but the specified edge nailing is missing at panel edges. What is the issue?
A service panel is installed where stored material blocks the working area. What must be maintained?
A fire-rated wall patch is finished with standard materials without matching the tested assembly. What must be preserved?
A joist hanger is installed with drywall screws instead of the fasteners specified by the hardware manufacturer. What should be corrected?
A field change includes 28 added labor-hours at $69 per hour plus $880 in material. What direct cost should be priced before markup?
People Also Study
Related Study Resources
Previous Question
A room requires 58 linear feet of baseboard priced at $2.85 per foot. What is the base material estimate before waste, tax, delivery or package rounding?
Next Question
For an ordinary copper branch circuit with 20-ampere overcurrent protection, assume no special application exception and no adjustment or installation condition requiring a larger conductor. Which listed size meets the ordinary small-conductor limit?