During a renovation project, the building inspector is checking the installation of new exterior wall panels. Which of the following requirements must be met to ensure proper installation?

ICC B2 exam practice question · Wall Construction & Coverings

During a renovation project, the building inspector is checking the installation of new exterior wall panels. Which of the following requirements must be met to ensure proper installation?

  • APanels must be installed at a minimum of 16 inches on center.
  • BPanels must be installed with a minimum overlap of 1 inch.
  • CPanels must be fastened at each stud.
  • Panels must be sealed with a water-resistant membrane.

Exam tip

Proper sealing of exterior wall panels is crucial for maintaining building integrity and preventing water damage.

Why D is correct

According to Section 1403.2.1 of the 2021 IBC, exterior wall panels must be sealed with a water-resistant membrane to protect against moisture intrusion.