You discover a discrepancy between the architectural drawings and structural drawings regarding beam locations. The project specifications state that structural drawings take precedence. However, following the structural drawings would create ADA compliance issues. What should you do?

Correct Answer

D) Issue an RFI to the design team for clarification

When there are conflicts between drawings that affect code compliance, an RFI (Request for Information) must be issued to the design team. ADA compliance cannot be compromised, so the design team must resolve this conflict.

Answer Options
A
Split the difference and compromise between both drawings
B
Follow the architectural drawings to maintain ADA compliance
C
Follow the structural drawings as specified
D
Issue an RFI to the design team for clarification

Why This Is the Correct Answer

When there are conflicts between drawings that affect code compliance, the contractor must issue an RFI to the design team for clarification. Even though the specifications state that structural drawings take precedence, this precedence cannot override mandatory ADA compliance requirements. The design team must resolve this conflict professionally and provide a solution that maintains both structural integrity and ADA compliance. Making unilateral decisions about code compliance issues exposes the contractor to significant liability.

Why the Other Options Are Wrong

Option A: Split the difference and compromise between both drawings

Following the structural drawings would violate ADA compliance requirements, which are mandatory federal regulations. Even though the specifications state structural drawings take precedence, this precedence cannot override code compliance. The contractor would be liable for knowingly constructing non-compliant work.

Option B: Follow the architectural drawings to maintain ADA compliance

Compromising between conflicting drawings is not the contractor's decision to make and could result in a solution that satisfies neither structural requirements nor ADA compliance. This approach lacks professional protocol and could create liability issues for unauthorized design modifications.

Option C: Follow the structural drawings as specified

While maintaining ADA compliance is crucial, unilaterally deciding to follow architectural drawings contradicts the project specifications and could compromise structural integrity. The contractor should not make design decisions without proper authorization from the design team.

Memory Technique

RFI = 'Required For Issues' - whenever there's a conflict involving codes or safety, an RFI is required to resolve it properly

Reference Hint

Florida Building Code - Chapter 11 (Accessibility), Construction contract administration sections regarding RFIs and drawing conflicts

Was this explanation helpful?

More Project Mgmt Questions

People Also Study

Related Study Resources

Practice More Contractor Exam Questions

Access all practice questions with progress tracking and adaptive difficulty to pass your Florida General Contractor exam.

Start Practicing

Disclaimer: EstatePass is an independent exam preparation platform and is not affiliated with, endorsed by, or connected to any state contractor licensing board, the Construction Industry Licensing Board (CILB), the Department of Business and Professional Regulation (DBPR), NASCLA, Pearson VUE, PSI, or any government agency. Exam requirements, fees, and regulations change frequently. Always verify current requirements with your state's licensing board before making decisions. Information shown was last verified on the dates indicated and may not reflect the most recent changes.