When should as-built drawings be updated during the construction process?

Correct Answer

B) Continuously as changes occur during construction

As-built drawings should be updated continuously as changes occur during construction to ensure accuracy and prevent information from being lost. Waiting until the end of the project often results in incomplete or inaccurate documentation.

Answer Options
A
Only at project completion
B
Continuously as changes occur during construction
C
After each major construction phase is completed
D
Monthly during progress meetings

Why This Is the Correct Answer

As-built drawings must be updated continuously as changes occur during construction to maintain accuracy and completeness. Construction projects frequently involve field changes, design modifications, and unforeseen conditions that deviate from original plans. If updates are delayed, critical information about actual installation locations, dimensions, and modifications can be forgotten or lost. Continuous updating ensures that the final as-built drawings accurately reflect the actual constructed conditions.

Why the Other Options Are Wrong

Option C: After each major construction phase is completed

Monthly updates during progress meetings are too infrequent and may miss important changes that occur between meetings, leading to gaps in documentation and potential loss of critical construction details.

Option D: Monthly during progress meetings

Updating only after major phases are completed creates gaps in documentation and increases the risk of forgetting smaller but important changes that occur during each phase, potentially resulting in inaccurate final drawings.

Memory Technique

Think 'AS changes happen, AS-BUILT drawings get updated' - the word 'AS' appears in both the timing and the document type to remember continuous updating.

Reference Hint

Florida Building Code Chapter 1, Administrative provisions regarding construction documents and record drawings

Was this explanation helpful?

More Contract Admin Questions

A project experiences a 30-day delay due to unusually severe weather. The contract includes a liquidated damages clause of $1,000 per day for delays. If the weather delay is excusable but not compensable, what liquidated damages apply?

A commercial project requires a total of 12 inspections. The building department charges $85 per inspection for the first 5 inspections, $65 for inspections 6-10, and $45 for any additional inspections. What is the total inspection fee?

What document must be posted at the job site before a Certificate of Occupancy can be issued for a commercial building?

A mixed-use development requires a variance for reduced setbacks. The property is located within 500 feet of a hospital. What additional consideration must be addressed?

A LEED project requires tracking of regional materials. Materials are considered regional if they are extracted, harvested, or recovered, as well as manufactured within what distance of the project site?

An indemnification clause in a construction contract typically requires the contractor to:

A property owner wants to convert a single-family home into a duplex in an area zoned for single-family residential use. The conversion meets all building codes but violates density requirements. What approval is needed?

As-built drawings are typically required to be submitted:

AIA Document A401 is primarily used for:

A general contractor is building a 12,000 square foot commercial warehouse. The building permit fee is calculated at $8.50 per $1,000 of construction value. If the project value is $2,400,000, what is the building permit fee?

People Also Study

Related Study Resources

Practice More Contractor Exam Questions

Access all practice questions with progress tracking and adaptive difficulty to pass your Florida General Contractor exam.

Start Practicing

Disclaimer: EstatePass is an independent exam preparation platform and is not affiliated with, endorsed by, or connected to any state contractor licensing board, the Construction Industry Licensing Board (CILB), the Department of Business and Professional Regulation (DBPR), NASCLA, Pearson VUE, PSI, or any government agency. Exam requirements, fees, and regulations change frequently. Always verify current requirements with your state's licensing board before making decisions. Information shown was last verified on the dates indicated and may not reflect the most recent changes.