What is the Cal/OSHA action level for lead exposure in construction that triggers medical surveillance?

Correct Answer

A) 30 μg/m³ over an 8-hour TWA

Cal/OSHA sets the action level for lead at 30 μg/m³ as an 8-hour time-weighted average, which triggers medical surveillance requirements.

Answer Options
A
30 μg/m³ over an 8-hour TWA
B
100 μg/m³ over an 8-hour TWA
C
15 μg/m³ over an 8-hour TWA
D
50 μg/m³ over an 8-hour TWA

Why This Is the Correct Answer

Cal/OSHA Title 8 Section 1532.1 sets the action level for lead at 30 micrograms per cubic meter (μg/m³) as an 8-hour time-weighted average (TWA). Exceeding this level triggers medical surveillance, biological monitoring, and other protective measures.

Why the Other Options Are Wrong

Option B: 100 μg/m³ over an 8-hour TWA

100 μg/m³ is not a recognized action level or PEL for lead under Cal/OSHA construction standards. This figure significantly exceeds permissible limits and would constitute a serious overexposure.

Option C: 15 μg/m³ over an 8-hour TWA

15 μg/m³ is below the action level and does not trigger medical surveillance requirements. It may be confused with OSHA's action level for silica (50 μg/m³) or other substances — but 15 μg/m³ is not the lead threshold.

Option D: 50 μg/m³ over an 8-hour TWA

50 μg/m³ is the Permissible Exposure Limit (PEL) for lead — the maximum allowable exposure — not the action level. The action level (30 μg/m³) is lower than the PEL and triggers preventive requirements before the PEL is reached.

Memory Technique

Remember: 30-50 for lead. Action at 30, Prohibited above 50. The 'A' in Action comes before 'P' in Prohibited, and 30 comes before 50.

Was this explanation helpful?

More California Questions

A construction site has employees working at heights of 12 feet above the ground on a steep-slope roof. According to Cal/OSHA fall protection requirements, what must be provided?

A construction crew is working outdoors in Fresno when the temperature reaches 97°F. Under Cal/OSHA heat illness prevention requirements, what is the minimum frequency for providing preventive cool-down rest periods?

A contractor is renovating a building built in 1975 and discovers material suspected to contain asbestos. According to Cal/OSHA regulations, what is the first required action?

Under Cal/OSHA regulations, what is the minimum frequency for reviewing and updating an Injury and Illness Prevention Program (IIPP)?

Calculate the minimum shade area required for 8 construction workers during a heat illness prevention cool-down period in California:

An employee working with lead-based paint removal has a blood lead level of 45 μg/dl. According to Cal/OSHA lead standards, what action must the employer take?

An IIPP must include procedures for investigating workplace accidents. According to Cal/OSHA, who is responsible for conducting these investigations?

A competent person inspecting a trench notices water seepage and minor soil movement. Under Cal/OSHA excavation standards, what action is required?

Calculate the required air changes per hour for a confined space with lead work under Cal/OSHA regulations. The space volume is 1,200 cubic feet and the exhaust fan moves 400 CFM. How many air changes per hour are being provided?

A roofing contractor is installing fall protection on a commercial building. Under Cal/OSHA Title 8, Section 1710, at what height does fall protection become mandatory for construction work?

People Also Study

Related Study Resources

Practice More Contractor Exam Questions

Access all practice questions with progress tracking and adaptive difficulty to pass your contractor license exam.

Start Practicing

Disclaimer: EstatePass is an independent exam preparation platform and is not affiliated with, endorsed by, or connected to any state contractor licensing board, the Construction Industry Licensing Board (CILB), the Department of Business and Professional Regulation (DBPR), NASCLA, Pearson VUE, PSI, or any government agency. Exam requirements, fees, and regulations change frequently. Always verify current requirements with your state's licensing board before making decisions. Information shown was last verified on the dates indicated and may not reflect the most recent changes.