During a building inspection in Hawaii, an inspector finds code violations. What typically happens to the work permit?
Correct Answer
C) Work may be stopped until violations are corrected
When code violations are found during inspection, work is typically stopped until the violations are corrected and re-inspected.
Why This Is the Correct Answer
When a building inspector identifies code violations during an inspection, the standard procedure is to issue a stop-work order or correction notice that halts construction until the violations are remedied and the work passes re-inspection. The permit itself is not automatically revoked; instead, work is stopped until compliance is achieved. This protects public safety while giving the contractor a path to cure the deficiency.
Why the Other Options Are Wrong
Option A: Permit is transferred to a qualified contractor
Permits are not transferred to another contractor simply because violations are found. Permit transfer involves a separate administrative process and is not triggered by a failed inspection. The original permit holder is typically given the opportunity to correct the deficiencies.
Option B: Permit is automatically revoked
Automatic permit revocation is not the standard response to code violations discovered during inspection. Revocation is a more severe action typically reserved for fraud, misrepresentation, or continued non-compliance after multiple opportunities to correct violations.
Option D: Permit remains valid with a fine imposed
A fine may be issued alongside a stop-work order, but the permit does not 'remain valid' in the sense that work may continue. Work is stopped pending correction of violations, regardless of any fine.
Memory Technique
Think 'violations = stop and fix' β inspectors don't immediately revoke permits; they stop work and require correction. Once fixed and re-inspected successfully, work can resume under the same permit.
More Hawaii Questions
What is the minimum general liability insurance coverage required for Hawaii contractors under HRS 444?
A contractor's license expires on June 30th. What is the late renewal penalty fee in Hawaii?
A contractor completes $85,000 worth of work on a residential project in Hawaii. The property owner fails to pay. Under HRS 507, what is the maximum lien amount the contractor can claim?
A contractor's insurance policy has a $1 million aggregate limit and a $500,000 per occurrence limit. Two separate incidents occur: one causing $400,000 in damages and another causing $300,000. How much will the insurance cover?
Under Hawaii's mechanics lien law, a subcontractor must provide preliminary notice within how many days of first furnishing labor or materials?
A subcontractor provides $28,000 worth of plumbing work but is not paid by the general contractor. Under HRS 507, what is the priority of the mechanics lien compared to a mortgage recorded before construction began?
A contractor discovers contaminated soil during excavation of a residential property. Under Hawaii environmental regulations, who must be notified immediately?
A contractor working on a project in a Hawaii historic district must obtain approval from which entity before beginning work?
A contractor fails to obtain required building permits before starting work. The property owner discovers this and terminates the contract. Under Hawaii law, what is the contractor's right to payment?
A contractor has 12 employees with a total annual payroll of $480,000. If the workers compensation rate is $12.75 per $100 of payroll, what is the annual premium?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Project Management
60 questions Β· 70% to pass
Related Study Resources
Previous Question
A contractor disturbs 1.5 acres of soil during construction in Hawaii. What environmental permit may be required?
Next Question
A Class C specialty contractor wants to bid on a project worth $175,000. According to HRS 444, what is the maximum project value a Class C contractor can undertake?