A section drawing is cut through a building at line "A-A" as shown on the floor plan. The section shows a foundation wall that extends 3 feet below grade. If the floor elevation is 100.5 feet, what is the elevation at the bottom of the foundation?
Correct Answer
C) 97.5 feet
The foundation extends 3 feet below grade. Assuming grade level equals floor elevation (100.5 feet), the bottom of foundation is 100.5 - 3.0 = 97.5 feet. Note that in practice, grade and floor elevations may differ.
Why This Is the Correct Answer
Option B is correct because the foundation extends 3 feet below grade level. When grade level is assumed to be at the same elevation as the floor (100.5 feet), we subtract the 3-foot foundation depth from the grade elevation. This calculation gives us 100.5 - 3.0 = 97.5 feet as the elevation at the bottom of the foundation. This is a standard approach when grade and floor elevations are considered equivalent in the problem.
Why the Other Options Are Wrong
Option A: 96.5 feet
Option D (99.5 feet) is incorrect because it represents only a 1-foot depth below grade (100.5 - 1.0 = 99.5), which is significantly less than the specified 3-foot foundation depth.
Option B: 98.5 feet
Option C (98.5 feet) is incorrect because it represents only a 2-foot depth below grade (100.5 - 2.0 = 98.5), which is less than the specified 3-foot foundation depth.
Memory Technique
Remember 'Down and Out' - when going DOWN into the ground, subtract the depth to find the bottom elevation OUT of your reference point.
Reference Hint
Florida Building Code, Chapter 18 (Soils and Foundations) or architectural drawing standards section for elevation calculations and foundation details
More Project Mgmt Questions
What is the minimum R-value required for wall insulation in Florida Climate Zone 2?
A subcontractor brings a new chemical product to your jobsite. Under the Globally Harmonized System (GHS), what information must be immediately available to workers?
A construction site has a trench that is 8 feet deep in Type B soil. What is the maximum allowable slope ratio for the trench walls without protective systems?
What is the maximum recommended spacing between drywall screws when attaching to wood studs?
Your crew discovers suspected asbestos-containing materials during a renovation project. What is the first action you should take?
A scaffold platform is 12 feet long and 5 feet wide. If the maximum load capacity is 25 pounds per square foot, what is the total weight capacity of this platform?
Which CSI MasterFormat Division would contain specifications for fire-stopping and firesafing materials?
In tilt-up concrete construction, what is the primary advantage of this method over conventional cast-in-place construction?
Which OSHA standard specifically addresses construction industry safety and health regulations?
A structural drawing shows a beam labeled 'W12x26'. What does the '26' represent?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Related Study Resources
Previous Question
A worker on your job site has been assigned to operate a jackhammer for concrete demolition. Which PPE is NOT specifically required by OSHA for this task?
Next Question
Your job site has a temporary wood frame structure under construction. What is the minimum required fire extinguisher rating for this type of construction?