A residential addition project in Hawaii requires a building permit. The contractor begins work without obtaining the permit. What is the potential penalty multiplier for permit fees?

Correct Answer

D) 2 times normal fees

Hawaii building codes typically impose double permit fees for work performed without proper permits.

Answer Options
A
3 times normal fees
B
5 times normal fees
C
1.5 times normal fees
D
2 times normal fees

Why This Is the Correct Answer

Hawaii building codes and county building ordinances impose a penalty of double (2x) the normal permit fees when work is performed without first obtaining the required building permit. This penalty is in addition to the requirement to obtain the permit retroactively and potentially stop work until the permit is issued.

Why the Other Options Are Wrong

Option A: 3 times normal fees

A 3x multiplier is not the standard penalty under Hawaii building codes for unpermitted work. While some jurisdictions use higher multipliers, Hawaii's standard is 2x the normal permit fee.

Option B: 5 times normal fees

A 5x multiplier would be an unusually severe penalty and is not the standard established under Hawaii building codes for performing work without a permit.

Option C: 1.5 times normal fees

A 1.5x multiplier is too low to reflect Hawaii's penalty for unpermitted work. The standard penalty is 2x, not a 50% surcharge.

Memory Technique

Remember 'Double Trouble.' Starting without a permit = DOUBLE the permit fee. Two consequences for forgetting: (1) stop work order, (2) 2x fee.

Was this explanation helpful?

More Hawaii Questions

What is the minimum general liability insurance coverage required for Hawaii contractors under HRS 444?

A contractor's license expires on June 30th. What is the late renewal penalty fee in Hawaii?

A contractor completes $85,000 worth of work on a residential project in Hawaii. The property owner fails to pay. Under HRS 507, what is the maximum lien amount the contractor can claim?

A contractor's insurance policy has a $1 million aggregate limit and a $500,000 per occurrence limit. Two separate incidents occur: one causing $400,000 in damages and another causing $300,000. How much will the insurance cover?

Under Hawaii's mechanics lien law, a subcontractor must provide preliminary notice within how many days of first furnishing labor or materials?

A subcontractor provides $28,000 worth of plumbing work but is not paid by the general contractor. Under HRS 507, what is the priority of the mechanics lien compared to a mortgage recorded before construction began?

A contractor discovers contaminated soil during excavation of a residential property. Under Hawaii environmental regulations, who must be notified immediately?

A contractor working on a project in a Hawaii historic district must obtain approval from which entity before beginning work?

A contractor fails to obtain required building permits before starting work. The property owner discovers this and terminates the contract. Under Hawaii law, what is the contractor's right to payment?

A contractor has 12 employees with a total annual payroll of $480,000. If the workers compensation rate is $12.75 per $100 of payroll, what is the annual premium?

People Also Study

Related Study Resources

Practice More Contractor Exam Questions

Access all practice questions with progress tracking and adaptive difficulty to pass your contractor license exam.

Start Practicing

Disclaimer: EstatePass is an independent exam preparation platform and is not affiliated with, endorsed by, or connected to any state contractor licensing board, the Construction Industry Licensing Board (CILB), the Department of Business and Professional Regulation (DBPR), NASCLA, Pearson VUE, PSI, or any government agency. Exam requirements, fees, and regulations change frequently. Always verify current requirements with your state's licensing board before making decisions. Information shown was last verified on the dates indicated and may not reflect the most recent changes.