A Michigan contractor completes $180,000 worth of work in a calendar year. What is the required workers' compensation insurance premium if the rate is 8.5% of payroll and payroll represents 35% of the contract value?
Correct Answer
B) $5,355
Payroll = $180,000 × 35% = $63,000. Premium = $63,000 × 8.5% = $5,355.
Why This Is the Correct Answer
Step 1: Calculate payroll. $180,000 × 35% = $63,000. Step 2: Calculate premium. $63,000 × 8.5% = $5,355. This two-step calculation correctly derives payroll from contract value first, then applies the insurance rate to the payroll base.
Why the Other Options Are Wrong
Option A: $15,300
$15,300 results from applying 8.5% directly to the full $180,000 contract value ($180,000 × 8.5% = $15,300), skipping the step of first calculating the payroll portion. Premiums are based on payroll, not total contract revenue.
Option C: $18,000
$18,000 appears to be 10% of the contract value — no mathematical basis connects this to the given rates. It may be a distractor using a round number from the contract value.
Option D: $6,300
$6,300 could result from applying 10% (not 8.5%) to the $63,000 payroll, or some other incorrect rate. It does not correctly apply the 8.5% rate to the payroll.
Memory Technique
Two steps: (1) Find payroll = Contract × payroll%. (2) Find premium = Payroll × rate%. Never skip step 1. Remember: Insurance is on PAYROLL, not CONTRACT value.
More Michigan Questions
A Michigan contractor forms an S-Corporation. What is the maximum number of shareholders allowed?
A contractor's employee is injured on a job site in Michigan. The contractor's workers' compensation insurance has a $500 deductible per claim. The total medical costs are $12,500 and lost wages are $3,200. What is the contractor's out-of-pocket cost for this claim?
What is the minimum general liability insurance coverage amount required for Michigan residential builders?
Under Michigan Act 299, what is the consequence for a contractor who performs work outside the scope of their license classification?
A contractor discovers that a subcontractor has filed a construction lien against their project. The general contractor believes the lien is invalid. What is the primary legal mechanism to challenge the lien in Michigan?
Under Michigan Act 299, what happens if a contractor continues to work without a valid license after it expires?
Which of the following best describes the 'pay when paid' clause limitation under Michigan law?
A project has total costs of $180,000 including $75,000 labor and $105,000 materials. With workers compensation at 7.8% of labor costs and general liability at 0.4% of total costs, what are the combined insurance costs?
A Michigan contractor is forming an LLC. What is the minimum general liability insurance coverage required for residential builders under Michigan law?
Under Michigan Act 299, a contractor's license must be renewed every: