A general contractor hires an unlicensed subcontractor who should have been licensed under TCA 62-6. What is the general contractor's liability?
Correct Answer
D) Liable for subcontractor's work and potential penalties
Under TCA 62-6, general contractors are liable for ensuring subcontractors are properly licensed and may face penalties for hiring unlicensed subs.
Why This Is the Correct Answer
Under TCA 62-6, a general contractor has an affirmative duty to verify that subcontractors hold the required licenses. Hiring an unlicensed subcontractor makes the GC liable for the sub's work quality, defects, and injuries, and also exposes the GC to administrative penalties from the Tennessee Board for Licensing Contractors.
Why the Other Options Are Wrong
Option A: Required to pay licensing fee for subcontractor
The GC is not simply required to pay a licensing fee on behalf of the subcontractor. There is no such 'proxy licensing fee' provision under TCA 62-6; the unlicensed sub must obtain their own license, and the GC faces penalties for using an unlicensed sub.
Option B: No liability if work was completed satisfactorily
Satisfactory completion of work does not shield the GC from liability. Licensing requirements exist regardless of work quality β the violation occurs at the point of hiring the unlicensed sub, not upon defective work.
Option C: Must provide additional insurance coverage
The GC is not merely required to provide additional insurance coverage. While increased insurance exposure may result, the primary legal consequence is direct liability for the sub's work and administrative penalties, not a simple insurance adjustment.
Memory Technique
GC = Guarantor of Compliance. If the GC hired someone without a license, the GC 'guaranteed' that sub's work to the owner and now owns the consequences.
More Tennessee Questions
Calculate the Tennessee workers' compensation premium for a roofing contractor with a $180,000 annual payroll and a rate of $28.50 per $100 of payroll:
How many hours of continuing education are required for Tennessee contractor license renewal?
Calculate the workers' compensation experience modification factor for a contractor with $85,000 in expected losses and $68,000 in actual losses:
Under Tennessee lien law, what is the maximum time limit to enforce a mechanics lien after it has been filed?
Under Tennessee lien law, which party has priority when multiple liens are filed against the same property?
Under Tennessee building codes, what is the maximum allowable deflection for a residential floor joist with a 16-foot span under live load?
A homeowner in Nashville hires an unlicensed contractor for $8,000 worth of electrical work. The contractor demands payment but the work fails inspection. Under TCA 62-6, what recourse does the unlicensed contractor have?
Under Tennessee building codes, what is the minimum ceiling height required for habitable rooms in residential construction?
A Tennessee contractor has 8 employees working on a residential project. The total weekly payroll is $6,400. If the workers' compensation rate for residential construction is $8.50 per $100 of payroll, what is the weekly workers' compensation premium?
A contractor is installing a septic system for a new home in rural Tennessee. The estimated cost is $8,500. According to TCA 62-6, what licensing requirement applies?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Project Management
60 questions Β· 70% to pass