EstatePass
Contract AdminPreconstructionmedium27% of exam part

A framing crew of 4 carpenters can frame 1,200 square feet per day. If carpenters earn $28 per hour for an 8-hour day, what is the labor cost per square foot for framing?

Correct Answer

C) $0.75

Daily labor cost = 4 carpenters × $28/hour × 8 hours = $896. Cost per square foot = $896 ÷ 1,200 sq ft = $0.747, which rounds to $0.75 per square foot.

Answer Options
A
$0.85
B
$1.12
C
$0.75
D
$0.93

Why This Is the Correct Answer

The correct answer is A ($0.75) because it follows the proper sequence of calculating total daily labor cost first, then dividing by production output. The calculation involves 4 carpenters × $28/hour × 8 hours = $896 total daily cost, then $896 ÷ 1,200 sq ft = $0.747 per square foot. When rounded to the nearest cent, this equals $0.75 per square foot.

Why the Other Options Are Wrong

Option A: $0.85

This answer ($0.93) is incorrect and likely results from calculation errors, possibly using incorrect hourly rates or making mistakes in the multiplication or division steps.

Option B: $1.12

This answer ($1.12) is incorrect and significantly higher than the correct cost, suggesting major calculation errors such as using wrong crew size, incorrect hours, or mathematical mistakes in the cost per unit calculation.

Option D: $0.93

This answer ($0.85) is incorrect because it represents an error in calculation, possibly from miscalculating the total daily labor cost or making an arithmetic mistake in the division step.

Memory Technique

Remember 'CRP': Crew cost × Rate × Production time, then divide by Production output. Think 'Cost per unit = Total cost ÷ Total units produced.'

Reference Hint

Construction cost estimating sections in contractor reference materials, specifically labor cost calculation methods and crew productivity rates

Was this explanation helpful?

More Contract Admin Questions

A project experiences a 30-day delay due to unusually severe weather. The contract includes a liquidated damages clause of $1,000 per day for delays. If the weather delay is excusable but not compensable, what liquidated damages apply?

A commercial project requires a total of 12 inspections. The building department charges $85 per inspection for the first 5 inspections, $65 for inspections 6-10, and $45 for any additional inspections. What is the total inspection fee?

What document must be posted at the job site before a Certificate of Occupancy can be issued for a commercial building?

A mixed-use development requires a variance for reduced setbacks. The property is located within 500 feet of a hospital. What additional consideration must be addressed?

A LEED project requires tracking of regional materials. Materials are considered regional if they are extracted, harvested, or recovered, as well as manufactured within what distance of the project site?

An indemnification clause in a construction contract typically requires the contractor to:

A property owner wants to convert a single-family home into a duplex in an area zoned for single-family residential use. The conversion meets all building codes but violates density requirements. What approval is needed?

As-built drawings are typically required to be submitted:

AIA Document A401 is primarily used for:

A general contractor is building a 12,000 square foot commercial warehouse. The building permit fee is calculated at $8.50 per $1,000 of construction value. If the project value is $2,400,000, what is the building permit fee?

People Also Study

Related Study Resources

Practice More Contractor Exam Questions

Access all practice questions with progress tracking and adaptive difficulty to pass your Florida General Contractor exam.

Start Practicing

Disclaimer: EstatePass is an independent exam preparation platform and is not affiliated with, endorsed by, or connected to any state contractor licensing board, the Construction Industry Licensing Board (CILB), the Department of Business and Professional Regulation (DBPR), NASCLA, Pearson VUE, PSI, or any government agency. Exam requirements, fees, and regulations change frequently. Always verify current requirements with your state's licensing board before making decisions. Information shown was last verified on the dates indicated and may not reflect the most recent changes.