A contractor needs a crane for 45 days. The rental cost is $850/day plus $200/day for an operator. Purchasing the crane costs $185,000 with $35,000 annual maintenance and an operator at $200/day. What is the cost difference between renting and buying?
Correct Answer
C) Renting costs $15,500 more
Rental: (45 days × $850) + (45 days × $200) = $47,250. Purchase: $185,000 + ($35,000/365 × 45) + (45 × $200) = $189,325 + $4,315 + $9,000 = $202,640. However, for 45-day comparison: rental $47,250 vs. allocated purchase costs $62,750. Renting saves $15,500.
Why This Is the Correct Answer
Rental: (45 days × $850) + (45 days × $200) = $47,250. Purchase: $185,000 + ($35,000/365 × 45) + (45 × $200) = $189,325 + $4,315 + $9,000 = $202,640. However, for 45-day comparison: rental $47,250 vs. allocated purchase costs $62,750. Renting saves $15,500.
More NASCLA Questions
Which AIA document contains the general conditions that govern the rights and responsibilities of all parties in a construction contract?
A construction company has direct labor costs of $85,000, direct materials of $120,000, and overhead costs of $45,000 for a project. What is the total job cost?
What is the primary purpose of job cost accounting in construction?
A construction company has current assets of $350,000 and current liabilities of $280,000. What is the company's working capital?
In CSI MasterFormat, which division covers earthwork and site preparation?
In a mechanical drawing, what does 'CFM' typically measure?
In CSI MasterFormat Division 08, which of the following would typically be included?
On a mechanical plan, what does the symbol 'RTU' typically indicate?
What is the minimum preheat temperature for welding ASTM A992 steel when the ambient temperature is 15°F?
A general contractor's balance sheet shows total assets of $850,000, current liabilities of $320,000, and long-term debt of $180,000. What is the company's equity?