A contractor is building on expansive clay soil with a plasticity index of 25. According to CBC, what type of foundation system is most appropriate?
Correct Answer
D) Post-tensioned slab on grade
Post-tensioned slabs are recommended for expansive soils with high plasticity index as they can accommodate soil movement without cracking.
Why This Is the Correct Answer
Post-tensioned slabs (option D) are the standard solution for expansive clay soils per CBC. The post-tensioning cables create a continuous biaxial compression across the slab, allowing it to move as a rigid unit when the soil swells or shrinks rather than cracking under differential movement. A plasticity index of 25 falls in the 'medium' to 'high' expansive range, triggering engineered foundation requirements.
Why the Other Options Are Wrong
Option A: Standard concrete slab with vapor barrier
A standard concrete slab with vapor barrier addresses moisture intrusion but provides no structural resistance to the upward heaving forces generated by expansive clay. The slab would crack under differential soil movement.
Option B: Shallow spread footings
Shallow spread footings are appropriate for stable, non-expansive soils. On expansive clay, they would be subject to differential heaving at each individual footing, causing uneven structural movement and potential building damage.
Option C: Crawl space with pier and beam
Pier and beam crawl space construction can work on some problem soils but does not address expansive clay as effectively as post-tensioned slabs. Piers must be drilled deep below the active zone, and the design is more complex and costly without the broad protective benefit of a PT slab.
Memory Technique
Think of 'PT slab = PRETENSION against the PRESSURE' β the post-tensioned cables pre-compress the slab so expansive soil pressure cannot crack it. High plasticity index = high expansion potential = need a foundation that moves as one rigid piece.
More California Questions
A contractor is installing shear walls in a residence located in Seismic Design Category D. The engineer's plans call for 15/32-inch structural sheathing with 8d nails at 6 inches on center at panel edges. The contractor wants to substitute 7/16-inch OSB with the same nailing. Is this substitution acceptable?
You are reviewing plans for a mixed-use building where the ground floor will house a restaurant with commercial kitchen equipment. The architect has specified standard residential electrical requirements throughout. What Title 24 compliance issue should you identify?
According to CBC seismic provisions, what is the concept behind the 'strong column, weak beam' design philosophy?
A residence in California has 2,800 sq ft of conditioned space. The HVAC system efficiency is 16 SEER. What is the approximate Title 24 compliance margin compared to the minimum 14 SEER requirement?
You're constructing a foundation on liquefiable soils identified in a California coastal area. The geotechnical report recommends deep foundations. Which option is most commonly specified?
A contractor is installing a heat recovery ventilation (HRV) system to comply with Title 24. The system serves a 2,000 sq ft house with 3 bedrooms. What is the minimum required ventilation rate?
During construction of a basement in sandy soil conditions, you encounter groundwater at 4 feet below grade. The basement extends 8 feet below grade. What is the critical design consideration per CBC?
During a seismic retrofit project, you discover that existing concrete has a compressive strength of 2,200 psi. The engineer specifies new anchor bolts that require 2,500 psi minimum concrete strength. What is the most appropriate action?
What is the maximum allowable notch depth in a 2x10 floor joist per CBC requirements?
You're reviewing plans for a wood-framed structure in seismic design category D. The project calls for a shear wall with 15/32-inch structural sheathing and 8d nails spaced 6 inches on center at panel edges. What is the allowable shear value per the CBC?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Project Management
60 questions Β· 70% to pass
Related Study Resources
Previous Question
During construction of a hospital in Los Angeles, you need to install seismic isolation bearings. Which CBC chapter specifically addresses seismic isolation systems?
Next Question
During construction, you discover that the actual soil conditions differ significantly from those described in the geotechnical report. What is the appropriate next step?