A C-36 plumbing contractor wants to install a solar water heating system. The system includes plumbing connections and electrical components. What licenses are required?

Correct Answer

D) C-36 and C-46 licenses

Solar installation requires C-46 classification. The C-36 contractor can do plumbing connections within their scope, but needs C-46 for the solar system or must subcontract to a C-46 contractor.

Answer Options
A
C-36 license only
B
C-36 and C-10 licenses
C
C-46 license only
D
C-36 and C-46 licenses

Why This Is the Correct Answer

A C-46 Solar contractor license is required to install solar energy systems, including solar water heating systems, because the scope of C-46 covers the full solar system installation. The C-36 plumbing license covers only the plumbing connections within the contractor's scope. For the complete solar water heating system, both C-36 (plumbing) and C-46 (solar) are needed, or the contractor must subcontract the solar portion to a C-46 licensee.

Why the Other Options Are Wrong

Option A: C-36 license only

The C-36 license alone is insufficient. While the C-36 covers plumbing connections, it does not authorize installation of the solar collectors, panels, or the solar system as a whole. Performing solar installation work without a C-46 license constitutes unlicensed contracting.

Option B: C-36 and C-10 licenses

C-36 and C-10 (Electrical) is not the correct combination. While the system has electrical components, a solar water heating system's primary licensing need beyond C-36 is C-46 (Solar), not C-10. The C-46 contractor's scope covers the solar system including its electrical integration, or a C-10 would only be needed if electrical work exceeds what C-46 covers.

Option C: C-46 license only

C-46 alone is insufficient if the contractor is also performing the plumbing connections and wishes to work under their C-36 authorization. The question specifies that the contractor holds a C-36 and wants to do the plumbing connections β€” both licenses are needed to legally cover both scopes of work.

Memory Technique

C-46 = 'Solar Specific.' Any time 'solar' appears in a question, C-46 is required for the solar portion. The C-36 covers the water pipes; C-46 covers the sun-powered equipment. Think: two systems, two licenses.

Was this explanation helpful?

More California Questions

People Also Study

Related Study Resources

Practice More Contractor Exam Questions

Access all practice questions with progress tracking and adaptive difficulty to pass your contractor license exam.

Start Practicing

Disclaimer: EstatePass is an independent exam preparation platform and is not affiliated with, endorsed by, or connected to any state contractor licensing board, the Construction Industry Licensing Board (CILB), the Department of Business and Professional Regulation (DBPR), NASCLA, Pearson VUE, PSI, or any government agency. Exam requirements, fees, and regulations change frequently. Always verify current requirements with your state's licensing board before making decisions. Information shown was last verified on the dates indicated and may not reflect the most recent changes.