A C-36 plumbing contractor wants to install a solar water heating system. The system includes plumbing connections and electrical components. What licenses are required?
Correct Answer
D) C-36 and C-46 licenses
Solar installation requires C-46 classification. The C-36 contractor can do plumbing connections within their scope, but needs C-46 for the solar system or must subcontract to a C-46 contractor.
Why This Is the Correct Answer
A C-46 Solar contractor license is required to install solar energy systems, including solar water heating systems, because the scope of C-46 covers the full solar system installation. The C-36 plumbing license covers only the plumbing connections within the contractor's scope. For the complete solar water heating system, both C-36 (plumbing) and C-46 (solar) are needed, or the contractor must subcontract the solar portion to a C-46 licensee.
Why the Other Options Are Wrong
Option A: C-36 license only
The C-36 license alone is insufficient. While the C-36 covers plumbing connections, it does not authorize installation of the solar collectors, panels, or the solar system as a whole. Performing solar installation work without a C-46 license constitutes unlicensed contracting.
Option B: C-36 and C-10 licenses
C-36 and C-10 (Electrical) is not the correct combination. While the system has electrical components, a solar water heating system's primary licensing need beyond C-36 is C-46 (Solar), not C-10. The C-46 contractor's scope covers the solar system including its electrical integration, or a C-10 would only be needed if electrical work exceeds what C-46 covers.
Option C: C-46 license only
C-46 alone is insufficient if the contractor is also performing the plumbing connections and wishes to work under their C-36 authorization. The question specifies that the contractor holds a C-36 and wants to do the plumbing connections β both licenses are needed to legally cover both scopes of work.
Memory Technique
C-46 = 'Solar Specific.' Any time 'solar' appears in a question, C-46 is required for the solar portion. The C-36 covers the water pipes; C-46 covers the sun-powered equipment. Think: two systems, two licenses.
More California Questions
A Class C-10 electrical contractor has annual gross receipts of $3.2 million. What is the required bond amount under current California law?
Under B&P Code Section 7125.4, what is the fee for initial Home Improvement Salesperson registration?
According to B&P Code Section 7125, what is the maximum penalty the CSLB can impose for contracting without a license?
A home improvement contract for $8,500 requires a 3-day right to cancel notice. The contract is signed on Tuesday at 2 PM. When does the cancellation period expire?
A contractor employs 15 workers across multiple job sites. The total annual payroll is $850,000 with a workers' comp rate of 4.1%. If they self-insure with a deposit requirement of 125% of estimated annual premium, what deposit is required?
A C-10 electrical contractor wants to perform plumbing work valued at $8,000 as part of a larger electrical project. Is this permissible under CSLB regulations?
A homeowner discovers that an unlicensed contractor performed $25,000 worth of work on their property. Under B&P Code Section 7031, what remedy is available to the homeowner?
A Class B general building contractor wants to perform electrical work valued at $750. According to the B&P Code, this contractor:
A contractor's qualifying individual leaves the company. How many days does the contractor have to replace them before the license becomes invalid?
According to B&P Code Section 7031, what happens to a contractor's right to payment if they perform work while unlicensed?