A building permit application requires structural drawings to be sealed by a licensed professional. Who can provide this seal for a commercial building project?
Correct Answer
A) Professional Engineer (PE) or Registered Architect (RA)
Structural drawings for commercial buildings must be sealed by either a Professional Engineer (PE) or Registered Architect (RA). Contractors cannot seal structural drawings regardless of their license type or experience level.
Why This Is the Correct Answer
Professional Engineers (PE) and Registered Architects (RA) are the only professionals legally authorized to seal structural drawings for commercial buildings in Florida. These professionals have completed specialized education, passed rigorous examinations, and maintain professional licenses that qualify them to take responsibility for structural design. The state requires this level of expertise because structural integrity is critical to public safety and building code compliance.
Why the Other Options Are Wrong
Option B: Licensed General Contractor only
Building Contractors, even with certification, do not have the authority to seal structural drawings. Their role is in construction implementation, not structural design verification.
Option C: Certified Building Contractor only
General Contractors, regardless of their license status, cannot seal structural drawings. Their expertise lies in construction management and building execution, not in structural engineering design and analysis.
Option D: Any licensed contractor with 10+ years experience
Experience alone, regardless of years, does not grant the legal authority to seal structural drawings. Only specific professional licenses (PE or RA) provide this authorization.
Memory Technique
Think 'PERA' - Professional Engineer and Registered Architect are the only ones who can seal structural drawings
Reference Hint
Florida Building Code Chapter 1, Section 107 - Submittal Documents, and Florida Statutes Chapter 471 (Engineering) and Chapter 481 (Architecture)
More Contract Admin Questions
A project experiences a 30-day delay due to unusually severe weather. The contract includes a liquidated damages clause of $1,000 per day for delays. If the weather delay is excusable but not compensable, what liquidated damages apply?
A commercial project requires a total of 12 inspections. The building department charges $85 per inspection for the first 5 inspections, $65 for inspections 6-10, and $45 for any additional inspections. What is the total inspection fee?
What document must be posted at the job site before a Certificate of Occupancy can be issued for a commercial building?
A mixed-use development requires a variance for reduced setbacks. The property is located within 500 feet of a hospital. What additional consideration must be addressed?
A LEED project requires tracking of regional materials. Materials are considered regional if they are extracted, harvested, or recovered, as well as manufactured within what distance of the project site?
An indemnification clause in a construction contract typically requires the contractor to:
A property owner wants to convert a single-family home into a duplex in an area zoned for single-family residential use. The conversion meets all building codes but violates density requirements. What approval is needed?
As-built drawings are typically required to be submitted:
AIA Document A401 is primarily used for:
A general contractor is building a 12,000 square foot commercial warehouse. The building permit fee is calculated at $8.50 per $1,000 of construction value. If the project value is $2,400,000, what is the building permit fee?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Project Management
60 questions Β· 70% to pass
Related Study Resources
Previous Question
Which of the following is NOT typically required for obtaining a Certificate of Occupancy for a commercial building?
Next Question
A project has a contract value of $850,000 with 10% retainage. If the contractor has submitted applications totaling $680,000 and received payments of $550,000, what is the total amount currently being retained?