A protective trench system is installed, but the crew excavates below its bottom without approval. What should be checked?
Correct Answer
B) System limit.
Protective systems must be used within their designed or approved limits.
Why This Is the Correct Answer
Protective systems must be used within their designed or approved limits.
More ca-trade-b Questions
A waterproofing membrane at a balcony turns up the wall, but fasteners for trim are planned through the low portion of the turn-up. What is the concern?
Nonmetallic cable passes through a bored hole near the edge of a stud. What is the field concern?
A sloped roof drains into a wall corner with no kickout flashing at the lower end. What failure is most likely?
A rated wall has unsealed pipe penetrations after rough trades are complete. What should be coordinated before cover?
Sound-control insulation in a multifamily party wall is missing in several stud bays before drywall. What should be done?
A circular saw is used after the lower guard stops returning over the blade. What should be done?
A sound-control batt is missing around a plumbing penetration in a rated corridor wall. What is the best field response?
A 2-inch horizontal sanitary branch must be installed at 1/4 inch fall per foot. What total fall is needed over a 24-foot run?
A 4-inch building drain is laid out with a required 1/8 inch fall per foot. What fall is required across 40 feet?
During a rough plumbing walk, a cleanout for a long horizontal waste line is shown behind a fixed cabinet panel. What is the best correction?