EstatePass
Class B TradeFinish Tradesmedium20% of exam part

In the shower replacement file, a stair trim run needs 22 pieces at $18 each. What material cost should be estimated?

Correct Answer

A) $396.

Twenty-two pieces at $18 each equals $396.

Answer Options
A
$396.
B
$374 total.
C
$418 total.
D
$440 total.

Why This Is the Correct Answer

Twenty-two pieces at $18 each equals $396.

Why the Other Options Are Wrong

Option B: $374 total.

$374 total. is below the supported result for trim cost calculation; it likely omits allowance, conversion, coverage, or final round-up.

Option C: $418 total.

$418 total. is above the supported result for trim cost calculation; it likely double-counts allowance, uses the wrong unit, or rounds too early.

Option D: $440 total.

$440 total. is above the supported result for trim cost calculation; it likely double-counts allowance, uses the wrong unit, or rounds too early.

Memory Technique

Measure to twenty-two, adjust for pieces, then let Estimating Stair set the finish line.

Reference Hint

Study anchor (closed-book): memorize Trim cost calculation from CSLB B General Building Study Guide; California Building Code, Title. / CSLB B General Building Study Guide finish carpentry estimating; know the rule or calculation trigger without relying on exam-room lookup.

Was this explanation helpful?

More Class B Trade Questions

People Also Study

Related Study Resources

Practice More Contractor Exam Questions

Access all practice questions with progress tracking and adaptive difficulty to pass your contractor license exam.

Start Practicing

Disclaimer: EstatePass is an independent exam preparation platform and is not affiliated with, endorsed by, or connected to any state contractor licensing board, the Construction Industry Licensing Board (CILB), the Department of Business and Professional Regulation (DBPR), NASCLA, Pearson VUE, PSI, or any government agency. Exam requirements, fees, and regulations change frequently. Always verify current requirements with your state's licensing board before making decisions. Information shown was last verified on the dates indicated and may not reflect the most recent changes.