A concrete sawcut control joint is laid out at 12 feet on center across a 60-foot slab. How many joint lines are needed inside the slab, excluding the outside edges?

Correct Answer

C) 4 joint lines.

A 60-foot length at 12-foot spacing creates five spaces. Excluding the outside edges leaves cuts at 12, 24, 36, and 48 feet, so 4 interior joint lines are needed.

Answer Options
A
3 joint lines.
B
5 joint lines.
C
4 joint lines.
D
6 joint lines.

Why This Is the Correct Answer

A 60-foot length at 12-foot spacing creates five spaces. Excluding the outside edges leaves cuts at 12, 24, 36, and 48 feet, so 4 interior joint lines are needed.

Why the Other Options Are Wrong

Option A: 3 joint lines.

3 joint lines. is below the supported result for concrete joint layout calculation; it likely omits allowance, conversion, coverage, or final round-up.

Option B: 5 joint lines.

5 joint lines. is above the supported result for concrete joint layout calculation; it likely double-counts allowance, uses the wrong unit, or rounds too early.

Option D: 6 joint lines.

6 joint lines. is above the supported result for concrete joint layout calculation; it likely double-counts allowance, uses the wrong unit, or rounds too early.

Memory Technique

Laying Out takeoff: count the condition before counting the package.

Reference Hint

Study anchor (closed-book): memorize Concrete joint layout calculation from California Building Code, California Code of Regulations Title 24. / Title 24 California Building Code concrete joint layout concepts; know the rule or calculation trigger without relying on exam-room lookup.

Was this explanation helpful?

More Class B Trade Questions

People Also Study

Related Study Resources

Practice More Contractor Exam Questions

Access all practice questions with progress tracking and adaptive difficulty to pass your contractor license exam.

Start Practicing

Disclaimer: EstatePass is an independent exam preparation platform and is not affiliated with, endorsed by, or connected to any state contractor licensing board, the Construction Industry Licensing Board (CILB), the Department of Business and Professional Regulation (DBPR), NASCLA, Pearson VUE, PSI, or any government agency. Exam requirements, fees, and regulations change frequently. Always verify current requirements with your state's licensing board before making decisions. Information shown was last verified on the dates indicated and may not reflect the most recent changes.