A load is expected to operate at maximum current for three hours or more. How is it classified for NEC load calculations?

Texas Journeyman exam practice question · Definitions, Theory & Plans

A load is expected to operate at maximum current for three hours or more. How is it classified for NEC load calculations?

  • As a continuous load
  • BAs a noncoincident load
  • CAs a motor load regardless of equipment type
  • DAs an intermittent load

Why A is correct

The NEC definition turns on duration at maximum current: three hours or more is continuous. That classification triggers applicable 125-percent sizing rules; it does not convert the equipment into a motor or prove loads are noncoincident.