EstatePass
SpdsSpds_sections_structural_envMEDIUM

When completing the structural section of an SPDS, a seller must disclose all of the following EXCEPT:

Correct Answer

D) Plans to remodel the kitchen after closing

Plans to remodel the kitchen after closing are future intentions, not current structural conditions, and are not required to be disclosed on the SPDS. The SPDS focuses on existing conditions and past problems. Option A is incorrect because previous termite damage should be disclosed even if repaired. Option B is incorrect because structural cracks, even small ones, should be disclosed. Option C is incorrect because roof age and inspection history are relevant structural information that should be disclosed.

Answer Options
A
Previous termite damage that was treated and repaired
B
A small crack in the basement wall that appeared last winter
C
The age of the roof and when it was last inspected
D
Plans to remodel the kitchen after closing

Why This Is the Correct Answer

Sign up free to unlock full analysis

Why the Other Options Are Wrong

Sign up free to unlock full analysis

Deep Analysis of This Spds Question

Sign up free to unlock full analysis

Background Knowledge for Spds

Sign up free to unlock full analysis
Sign up free to unlock full analysis

Real World Application in Spds

Sign up free to unlock full analysis

Common Mistakes to Avoid on Spds Questions

Sign up free to unlock full analysis

Related Topics & Key Terms

Key Terms:

SPDSstructural disclosurefuture plansrequirements
Was this explanation helpful?

More Spds Questions

People Also Study

Spds Questions

Practice More Questions

Access 2,000+ practice questions and pass your real estate exam.

Start Practicing