Lead-based paint removal requires worker protection when the lead concentration exceeds what threshold?
Correct Answer
D) 50 μg/m³
OSHA's lead standard requires worker protection when airborne lead concentrations exceed 50 μg/m³ (micrograms per cubic meter). This is the permissible exposure limit for lead in construction work.
Why This Is the Correct Answer
OSHA's lead standard for construction (29 CFR 1926.62) establishes 50 μg/m³ as the permissible exposure limit (PEL) for airborne lead concentrations. When this threshold is exceeded, employers must implement specific worker protection measures including respiratory protection, protective clothing, and medical surveillance. This standard applies specifically to construction activities involving lead-based paint removal and renovation work. The 50 μg/m³ limit is based on an 8-hour time-weighted average exposure.
Why the Other Options Are Wrong
Option A: 30 μg/m³
100 μg/m³ is too high and would represent a dangerous exposure level that exceeds OSHA's permissible exposure limit by double. This concentration would require immediate corrective action and enhanced protection measures.
Option B: 10 μg/dL
10 μg/dL refers to blood lead levels (micrograms per deciliter), not airborne concentration limits. This is a medical measurement used to assess lead absorption in the body, not workplace air quality standards.
Option C: 100 μg/m³
30 μg/m³ is the action level under OSHA's lead standard, which triggers certain requirements like exposure monitoring and medical surveillance, but it is not the threshold that requires full worker protection measures.
Memory Technique
Think 'Fifty for Safety' - when airborne lead hits 50 μg/m³, full safety protection kicks in. Also remember the units: μg/m³ for air, μg/dL for blood.
Reference Hint
OSHA Construction Standards 29 CFR 1926.62 - Lead exposure in construction, or Florida Building Code Chapter 7 - Special Construction Requirements
More Project Mgmt Questions
What is the minimum R-value required for wall insulation in Florida Climate Zone 2?
A subcontractor brings a new chemical product to your jobsite. Under the Globally Harmonized System (GHS), what information must be immediately available to workers?
A construction site has a trench that is 8 feet deep in Type B soil. What is the maximum allowable slope ratio for the trench walls without protective systems?
What is the maximum recommended spacing between drywall screws when attaching to wood studs?
Your crew discovers suspected asbestos-containing materials during a renovation project. What is the first action you should take?
A scaffold platform is 12 feet long and 5 feet wide. If the maximum load capacity is 25 pounds per square foot, what is the total weight capacity of this platform?
Which CSI MasterFormat Division would contain specifications for fire-stopping and firesafing materials?
In tilt-up concrete construction, what is the primary advantage of this method over conventional cast-in-place construction?
Which OSHA standard specifically addresses construction industry safety and health regulations?
A structural drawing shows a beam labeled 'W12x26'. What does the '26' represent?
People Also Study
Business & Financial Management
120 questions · 70% to pass
Contract Administration
60 questions · 70% to pass
Related Study Resources
Previous Question
What is the standard on-center spacing for wood studs in residential construction?
Next Question
During a site layout, the benchmark elevation is 100.00 feet. If the finish floor elevation is specified as 102.50 feet and the slab thickness is 4 inches, what should be the elevation of the subgrade?