In CSI MasterFormat, which division covers earthwork and site preparation?
Correct Answer
B) Division 31 - Earthwork
Division 31 - Earthwork covers excavation, grading, and site preparation activities in the current CSI MasterFormat.
Why This Is the Correct Answer
Division 31 - Earthwork is the correct CSI MasterFormat division that covers all earthwork and site preparation activities. This division includes excavation, grading, soil stabilization, dewatering, and other ground preparation work. The CSI MasterFormat 2016 edition specifically designates Division 31 for earthwork operations, making it the standard reference for contractors when organizing specifications and cost estimates for site preparation projects.
Why the Other Options Are Wrong
Option A: Division 03 - Concrete
Division 02 - Existing Conditions deals with assessment and remediation of existing site conditions, such as hazardous material abatement, selective demolition, and structure moving. While it involves existing site work, it does not cover new earthwork or site preparation activities like excavation and grading.
Option C: Division 32 - Exterior Improvements
Division 32 - Exterior Improvements covers site improvements like paving, landscaping, fencing, and outdoor structures that are installed after earthwork is complete. While related to site work, this division deals with finished improvements rather than the initial earthwork and site preparation phases.
Memory Technique
Remember '31 = Dirt Work Done' - Division 31 is where all the dirt moving, excavation, and earthwork happens before anything else can be built on the site.
More nascla-commercial-gc Questions
How long should daily reports and project correspondence typically be retained after project completion?
Which AIA document contains the general conditions that govern the rights and responsibilities of all parties in a construction contract?
A construction company has direct labor costs of $85,000, direct materials of $120,000, and overhead costs of $45,000 for a project. What is the total job cost?
What is the primary purpose of job cost accounting in construction?
A construction company has current assets of $350,000 and current liabilities of $280,000. What is the company's working capital?
On an electrical plan, a rectangle with three parallel lines inside typically represents:
In a mechanical drawing, what does 'CFM' typically measure?
In CSI MasterFormat Division 08, which of the following would typically be included?
On a mechanical plan, what does the symbol 'RTU' typically indicate?
What is the minimum preheat temperature for welding ASTM A992 steel when the ambient temperature is 15Β°F?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Project Management
60 questions Β· 70% to pass