In a flood-prone area designated as Zone AE with a base flood elevation of 12 feet, FEMA requires the lowest floor of new construction to be at what minimum elevation?
Correct Answer
C) 13 feet (1 foot above BFE)
FEMA and most local floodplain ordinances require new construction to have the lowest floor at least one foot above the base flood elevation for safety margin and insurance compliance.
Why This Is the Correct Answer
FEMA requires new construction in flood zones to have the lowest floor elevated at least one foot above the Base Flood Elevation (BFE) as a safety margin. This requirement provides protection against uncertainties in flood predictions and ensures compliance with the National Flood Insurance Program. The one-foot freeboard is the standard minimum requirement for residential construction in Zone AE areas. Building at exactly the BFE would not provide adequate protection and could result in flood damage and insurance issues.
Why the Other Options Are Wrong
Option A: 15 feet (3 feet above BFE)
Three feet above BFE (15 feet) is excessive for the minimum requirement and would unnecessarily increase construction costs while exceeding FEMA's standard freeboard requirement.
Option D: 12 feet (at base flood elevation)
While 2 feet above BFE (14 feet) would provide additional protection, it exceeds FEMA's minimum requirement and is not the standard requirement for Zone AE areas.
Memory Technique
Think 'BFE Plus One to Get it Done' - you always need at least one foot above the base flood elevation to meet FEMA requirements.
Reference Hint
Florida Building Code Chapter 15 - Referenced Standards, Section on Flood Resistant Construction, or ASCE 24 Flood Resistant Design and Construction
More Business & Finance Questions
A general contractor purchases equipment worth $45,000 with a useful life of 9 years and no salvage value. Using straight-line depreciation, what is the annual depreciation expense?
What is the typical recommended coverage amount for general liability insurance for a small to medium-sized general contracting business?
A contractor estimates startup costs of $75,000 for equipment, $25,000 for initial inventory, $15,000 for insurance premiums, and $10,000 for working capital. They can finance 70% of the total. How much cash do they need?
When establishing professional relationships with architects and engineers, what is the most important factor for a general contractor to consider?
A partnership agreement for a construction company should address all of the following EXCEPT:
A contractor purchases a truck for $60,000. After 5 years, it has accumulated depreciation of $35,000. What is the truck's book value?
A contractor's business plan projects first-year revenue of $500,000 with a 15% net profit margin. If actual revenue is $450,000 with the same profit margin, what is the variance in net profit?
Using the Modified Accelerated Cost Recovery System (MACRS), construction equipment is typically depreciated over how many years?
A contractor is comparing financing options for equipment purchase. Option A: $80,000 cash purchase. Option B: $20,000 down, $65,000 financed at 6% for 4 years. What is the total cost of Option B?
A contractor purchases equipment using a capital lease with a present value of $120,000. How should this be recorded on the balance sheet?