Contract AdminPermitsmedium20% of exam part

During a rough electrical inspection, the inspector finds several code violations. The contractor fixes the violations and wants to schedule a re-inspection. How soon can the re-inspection typically be scheduled?

Correct Answer

C) Within 24-48 hours

Re-inspections can typically be scheduled within 24-48 hours after corrections are made. Most jurisdictions prioritize re-inspections to avoid project delays once violations are corrected.

Answer Options
A
Within one week
B
Next business day
C
Within 24-48 hours
D
Immediately the same day

Why This Is the Correct Answer

CORRECT_ANSWER - Re-inspections are typically scheduled within 24-48 hours after corrections are made to code violations. This timeframe balances the inspector's schedule with the contractor's need to keep the project moving forward. Most jurisdictions understand that construction delays are costly, so they prioritize re-inspections while still allowing reasonable time for scheduling. This standard timeframe is consistent across most Florida jurisdictions and reflects industry best practices.

Why the Other Options Are Wrong

Option A: Within one week

Same-day re-inspections are rarely possible due to inspector scheduling constraints and the need for proper documentation of corrections. Inspectors typically have full schedules and cannot accommodate immediate re-inspections except in emergency situations.

Option D: Immediately the same day

Next business day is too restrictive and doesn't account for inspector availability or the complexity of scheduling. While some simple re-inspections might occur the next day, this isn't the typical standard timeframe that contractors can reliably expect.

Memory Technique

Think '24-48 RE-pair' - after you RE-pair violations, expect 24-48 hours for RE-inspection scheduling

Reference Hint

Florida Building Code Administration chapter or local jurisdiction inspection procedures manual - look for sections on inspection scheduling and re-inspection protocols

Was this explanation helpful?

More Contract Admin Questions

A project experiences a 30-day delay due to unusually severe weather. The contract includes a liquidated damages clause of $1,000 per day for delays. If the weather delay is excusable but not compensable, what liquidated damages apply?

A commercial project requires a total of 12 inspections. The building department charges $85 per inspection for the first 5 inspections, $65 for inspections 6-10, and $45 for any additional inspections. What is the total inspection fee?

What document must be posted at the job site before a Certificate of Occupancy can be issued for a commercial building?

A mixed-use development requires a variance for reduced setbacks. The property is located within 500 feet of a hospital. What additional consideration must be addressed?

A LEED project requires tracking of regional materials. Materials are considered regional if they are extracted, harvested, or recovered, as well as manufactured within what distance of the project site?

An indemnification clause in a construction contract typically requires the contractor to:

A property owner wants to convert a single-family home into a duplex in an area zoned for single-family residential use. The conversion meets all building codes but violates density requirements. What approval is needed?

As-built drawings are typically required to be submitted:

AIA Document A401 is primarily used for:

A general contractor is building a 12,000 square foot commercial warehouse. The building permit fee is calculated at $8.50 per $1,000 of construction value. If the project value is $2,400,000, what is the building permit fee?

People Also Study

Related Study Resources

Practice More Contractor Exam Questions

Access all practice questions with progress tracking and adaptive difficulty to pass your Florida General Contractor exam.

Start Practicing

Disclaimer: EstatePass is an independent exam preparation platform and is not affiliated with, endorsed by, or connected to any state contractor licensing board, the Construction Industry Licensing Board (CILB), the Department of Business and Professional Regulation (DBPR), NASCLA, Pearson VUE, PSI, or any government agency. Exam requirements, fees, and regulations change frequently. Always verify current requirements with your state's licensing board before making decisions. Information shown was last verified on the dates indicated and may not reflect the most recent changes.