A site plan shows existing grade at elevation 102.5' and proposed grade at elevation 104.2'. What is the amount of fill required at this location?
Correct Answer
C) 1.7 feet of fill
The fill required is calculated by subtracting existing grade from proposed grade: 104.2' - 102.5' = 1.7'. Since the result is positive, this indicates 1.7 feet of fill is needed to raise the grade.
Why This Is the Correct Answer
To determine fill requirements, you subtract the existing grade elevation from the proposed grade elevation. When the proposed grade (104.2') is higher than the existing grade (102.5'), the positive result indicates fill is needed. The calculation 104.2' - 102.5' = 1.7' shows exactly how much fill material must be added to raise the ground to the desired elevation.
Why the Other Options Are Wrong
Option A: 206.7 feet total elevation
This incorrectly adds the two elevations together (102.5' + 104.2' = 206.7'), which has no meaning in grading calculations. We need the difference between elevations, not their sum.
Option D: 1.7 feet of cut
This is incorrect because cut refers to removing soil when the proposed grade is lower than existing grade. Since 104.2' is higher than 102.5', we need to add material (fill), not remove it (cut).
Memory Technique
Think 'P-E=F/C' (Proposed minus Existing equals Fill or Cut). Positive result = Fill up, Negative result = Cut down.
Reference Hint
Look up site work and grading sections in construction reference materials, typically found in earthwork or site preparation chapters
More Project Mgmt Questions
What is the minimum R-value required for wall insulation in Florida Climate Zone 2?
A subcontractor brings a new chemical product to your jobsite. Under the Globally Harmonized System (GHS), what information must be immediately available to workers?
A construction site has a trench that is 8 feet deep in Type B soil. What is the maximum allowable slope ratio for the trench walls without protective systems?
What is the maximum recommended spacing between drywall screws when attaching to wood studs?
Your crew discovers suspected asbestos-containing materials during a renovation project. What is the first action you should take?
A scaffold platform is 12 feet long and 5 feet wide. If the maximum load capacity is 25 pounds per square foot, what is the total weight capacity of this platform?
Which CSI MasterFormat Division would contain specifications for fire-stopping and firesafing materials?
In tilt-up concrete construction, what is the primary advantage of this method over conventional cast-in-place construction?
Which OSHA standard specifically addresses construction industry safety and health regulations?
A structural drawing shows a beam labeled 'W12x26'. What does the '26' represent?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass