A mason is building a CMU wall and notices the blocks are absorbing water quickly from the mortar. What should be done before continuing?
Correct Answer
C) Wet the blocks before laying
When CMU blocks are very dry and absorbing water rapidly from mortar, they should be dampened before laying. This prevents the blocks from drawing too much water from the mortar, which would weaken the bond and mortar strength.
Why This Is the Correct Answer
When CMU blocks are excessively dry, they act like sponges and rapidly absorb water from the fresh mortar. This water absorption weakens the mortar's hydration process and reduces bond strength between the block and mortar. Pre-wetting the blocks to a surface-dry condition allows the mortar to maintain its proper water content for optimal curing and bonding. The blocks should be damp but not dripping wet to achieve the best mortar-to-block adhesion.
Why the Other Options Are Wrong
Option A: Use a drier mortar mix
While bonding agents can improve adhesion in some situations, they don't address the root problem of rapid water absorption. The dry blocks would still draw water from the mortar, and bonding agents are typically used for different applications like bonding new concrete to old.
Option D: Apply a bonding agent to the blocks
Using a drier mortar mix would actually worsen the problem by providing even less water for proper hydration. The dry blocks would still absorb what little water remains in the mortar, leading to poor workability and weaker bonds.
Memory Technique
Think 'Thirsty blocks steal water' - just like you'd give a thirsty person a drink, give thirsty blocks some water before laying them so they don't steal from the mortar.
Reference Hint
Florida Building Code, Chapter 21 - Masonry, or ACI 530 Building Code Requirements for Masonry Structures regarding mortar and unit preparation
More Project Mgmt Questions
What is the minimum R-value required for wall insulation in Florida Climate Zone 2?
A subcontractor brings a new chemical product to your jobsite. Under the Globally Harmonized System (GHS), what information must be immediately available to workers?
A construction site has a trench that is 8 feet deep in Type B soil. What is the maximum allowable slope ratio for the trench walls without protective systems?
What is the maximum recommended spacing between drywall screws when attaching to wood studs?
Your crew discovers suspected asbestos-containing materials during a renovation project. What is the first action you should take?
A scaffold platform is 12 feet long and 5 feet wide. If the maximum load capacity is 25 pounds per square foot, what is the total weight capacity of this platform?
Which CSI MasterFormat Division would contain specifications for fire-stopping and firesafing materials?
In tilt-up concrete construction, what is the primary advantage of this method over conventional cast-in-place construction?
Which OSHA standard specifically addresses construction industry safety and health regulations?
A structural drawing shows a beam labeled 'W12x26'. What does the '26' represent?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Related Study Resources
Previous Question
A site plan indicates a building setback of 25 feet from the front property line. If the lot depth is 120 feet and the building depth is 40 feet, what is the minimum rear yard setback possible?
Next Question
A grading plan shows contour lines spaced 2 feet apart vertically. If the horizontal distance between two adjacent contour lines is 40 feet, what is the slope percentage?