EstatePass
AlabamaAL Supplementhard100% of exam part

A contractor is building a single-family home in Alabama. The foundation excavation reveals unexpected rock requiring blasting. Under Alabama building codes, what additional requirement must be met?

Correct Answer

A) All of the above

Alabama building codes require notification of neighbors, separate permits for blasting, and use of licensed blasting contractors for safety and legal compliance.

Answer Options
A
All of the above
B
Hire a licensed blasting contractor
C
Notify neighbors 48 hours in advance
D
Obtain a separate blasting permit

Why This Is the Correct Answer

Option A is correct — 'All of the above.' Alabama building codes require all three listed measures when blasting is necessary: (1) hiring a licensed blasting contractor, (2) notifying neighbors 48 hours in advance, and (3) obtaining a separate blasting permit. These requirements work together to ensure safety, legal compliance, and community awareness. No single measure alone satisfies the full regulatory obligation.

Why the Other Options Are Wrong

Option B: Hire a licensed blasting contractor

Hiring a licensed blasting contractor is a required step, but it is only one of several requirements. Selecting this alone would ignore the permit and neighbor notification requirements, resulting in an incomplete and non-compliant approach.

Option C: Notify neighbors 48 hours in advance

Notifying neighbors 48 hours in advance is required for safety and community relations, but it is only one component of the blasting requirements. Without the permit and a licensed blasting contractor, the operation would still be non-compliant.

Option D: Obtain a separate blasting permit

Obtaining a separate blasting permit is necessary and distinct from the standard building permit, but it alone does not satisfy all requirements. The licensed blasting contractor and neighbor notification requirements must also be met.

Memory Technique

For blasting, remember the three P's — Professional (licensed contractor), Permission (separate permit), and People notification (48-hour advance notice to neighbors). All three must happen before any blast. When you see 'All of the above' and all individual options seem valid, trust it.

Was this explanation helpful?

More Alabama Questions

People Also Study

Related Study Resources

Practice More Contractor Exam Questions

Access all practice questions with progress tracking and adaptive difficulty to pass your contractor license exam.

Start Practicing

Disclaimer: EstatePass is an independent exam preparation platform and is not affiliated with, endorsed by, or connected to any state contractor licensing board, the Construction Industry Licensing Board (CILB), the Department of Business and Professional Regulation (DBPR), NASCLA, Pearson VUE, PSI, or any government agency. Exam requirements, fees, and regulations change frequently. Always verify current requirements with your state's licensing board before making decisions. Information shown was last verified on the dates indicated and may not reflect the most recent changes.