EstatePass

A main shutoff will not fully close before valve replacement. What is the safe plan?

California C-36 exam practice question · Service, Repair & Remodel

A main shutoff will not fully close before valve replacement. What is the safe plan?

  • ACut the pressurized pipe quickly
  • Establish reliable upstream isolation and controlled drain-down
  • CRely on the failed valve
  • DHeat the wet pressurized joint

Why B is correct

Verification of isolation, pressure relief, drainage destination, affected occupants, backup controls, and emergency restoration prevents flooding and injury. A leaking valve is not dependable isolation.

Practice 44 more Service, Repair & Remodel questions

Timed mock exams, a wrong book and flashcards — one subscription covers every contractor exam line.

Start studying free