A drain route conflicts with a structural beam and electrical gear. What is the best preconstruction response?
- ARoute above the electrical gear
- BFabricate first and resolve later
- CCut the beam in the field
- Coordinate before fabrication
Why D is correct
Early coordination protects structure, required electrical clearances, drainage grade, access, and fire assemblies. Unapproved field cutting or routing over sensitive equipment can create safety and rework problems.
