EstatePass

A crew begins heavy rooftop replacement work during extreme heat. Which prevention and emergency provisions belong in the plan?

California C-20 exam practice question · Safety

A crew begins heavy rooftop replacement work during extreme heat. Which prevention and emergency provisions belong in the plan?

  • Heat-illness prevention plan
  • BLess water to reduce breaks for the described HVAC equipment and measured operating conditions
  • CNo buddy checks
  • DDark clothing only

Why A is correct

The best answer is: Heat-illness prevention plan. Roof surfaces intensify heat and new workers may not be acclimatized. California heat-illness controls must be active before symptoms appear. The transferred operating condition requires the same design, installation, diagnostic, or safety principle in a different HVAC context. The other choices skip a prerequisite, conflict with the listed procedure, or treat a symptom without controlling its cause.

Practice 46 more Safety questions

Timed mock exams, a wrong book and flashcards — one subscription covers every contractor exam line.

Start studying free