EstatePass
Contract AdminPermitseasy20% of exam part

Which type of Florida contractor license allows work on any type of construction project without monetary limit?

Correct Answer

A) Certified General Contractor

A Certified General Contractor license in Florida allows the holder to work on any type of construction project without monetary limitations. This is the most comprehensive contractor license available.

Answer Options
A
Certified General Contractor
B
Registered Building Contractor
C
Registered General Contractor
D
Certified Building Contractor

Why This Is the Correct Answer

A Certified General Contractor (CGC) license is the highest level of contractor license in Florida, providing unlimited scope and monetary authority. This license allows the holder to perform any type of construction work including residential, commercial, and industrial projects without any dollar amount restrictions. The CGC license encompasses all other contractor license types and represents the most comprehensive construction authority available in the state. It is the only license that truly has no limitations on project type or contract value.

Why the Other Options Are Wrong

Option B: Registered Building Contractor

A Registered General Contractor has monetary limitations, typically restricted to contracts under $200,000, which means it does not allow unlimited monetary authority.

Option C: Registered General Contractor

A Registered Building Contractor has both scope and monetary limitations, typically restricted to projects under $200,000 and limited to building construction only.

Memory Technique

Think 'CGC = Can Go Crazy' - meaning no limits on project type or dollar amount, while all other licenses have some form of restriction.

Reference Hint

Florida Statutes Chapter 489 - Contracting, specifically Section 489.105 regarding license classifications and limitations

Was this explanation helpful?

More Contract Admin Questions

A project experiences a 30-day delay due to unusually severe weather. The contract includes a liquidated damages clause of $1,000 per day for delays. If the weather delay is excusable but not compensable, what liquidated damages apply?

A commercial project requires a total of 12 inspections. The building department charges $85 per inspection for the first 5 inspections, $65 for inspections 6-10, and $45 for any additional inspections. What is the total inspection fee?

What document must be posted at the job site before a Certificate of Occupancy can be issued for a commercial building?

A mixed-use development requires a variance for reduced setbacks. The property is located within 500 feet of a hospital. What additional consideration must be addressed?

A LEED project requires tracking of regional materials. Materials are considered regional if they are extracted, harvested, or recovered, as well as manufactured within what distance of the project site?

An indemnification clause in a construction contract typically requires the contractor to:

A property owner wants to convert a single-family home into a duplex in an area zoned for single-family residential use. The conversion meets all building codes but violates density requirements. What approval is needed?

As-built drawings are typically required to be submitted:

AIA Document A401 is primarily used for:

A general contractor is building a 12,000 square foot commercial warehouse. The building permit fee is calculated at $8.50 per $1,000 of construction value. If the project value is $2,400,000, what is the building permit fee?

People Also Study

Related Study Resources

Practice More Contractor Exam Questions

Access all practice questions with progress tracking and adaptive difficulty to pass your Florida General Contractor exam.

Start Practicing

Disclaimer: EstatePass is an independent exam preparation platform and is not affiliated with, endorsed by, or connected to any state contractor licensing board, the Construction Industry Licensing Board (CILB), the Department of Business and Professional Regulation (DBPR), NASCLA, Pearson VUE, PSI, or any government agency. Exam requirements, fees, and regulations change frequently. Always verify current requirements with your state's licensing board before making decisions. Information shown was last verified on the dates indicated and may not reflect the most recent changes.