Contract AdminPermitsmedium20% of exam part

Which type of contractor license is required to perform electrical work as part of a general construction project in Florida?

Correct Answer

B) Either a General Contractor or Electrical Contractor license

In Florida, electrical work can be performed by either a licensed General Contractor or a licensed Electrical Contractor, as General Contractors can perform all trades within their scope.

Answer Options
A
Electrical Contractor license only
B
Either a General Contractor or Electrical Contractor license
C
Both General Contractor and Electrical Contractor licenses
D
General Contractor license only

Why This Is the Correct Answer

Florida law allows both General Contractors and Electrical Contractors to perform electrical work within construction projects. General Contractors have broad authority to perform all construction trades within their scope of work, including electrical installations. This dual licensing approach provides flexibility in project management while maintaining proper oversight and qualifications for electrical work.

Why the Other Options Are Wrong

Option C: Both General Contractor and Electrical Contractor licenses

This is incorrect because it suggests both licenses are required simultaneously, which is not the case. Only one of the two license types is needed - either a General Contractor license OR an Electrical Contractor license.

Option D: General Contractor license only

This is incorrect because it excludes General Contractors, who are legally authorized to perform electrical work as part of their comprehensive construction authority in Florida.

Memory Technique

Think 'GC = General Coverage' - General Contractors can cover all trades including electrical. Remember the phrase 'Either works' for electrical work licensing in Florida.

Reference Hint

Florida Statutes Chapter 489 - Contracting; Florida Administrative Code 61G4 - Construction Industry Licensing Board rules regarding scope of practice

Was this explanation helpful?

More Contract Admin Questions

A project experiences a 30-day delay due to unusually severe weather. The contract includes a liquidated damages clause of $1,000 per day for delays. If the weather delay is excusable but not compensable, what liquidated damages apply?

A commercial project requires a total of 12 inspections. The building department charges $85 per inspection for the first 5 inspections, $65 for inspections 6-10, and $45 for any additional inspections. What is the total inspection fee?

What document must be posted at the job site before a Certificate of Occupancy can be issued for a commercial building?

A mixed-use development requires a variance for reduced setbacks. The property is located within 500 feet of a hospital. What additional consideration must be addressed?

A LEED project requires tracking of regional materials. Materials are considered regional if they are extracted, harvested, or recovered, as well as manufactured within what distance of the project site?

An indemnification clause in a construction contract typically requires the contractor to:

A property owner wants to convert a single-family home into a duplex in an area zoned for single-family residential use. The conversion meets all building codes but violates density requirements. What approval is needed?

As-built drawings are typically required to be submitted:

AIA Document A401 is primarily used for:

A general contractor is building a 12,000 square foot commercial warehouse. The building permit fee is calculated at $8.50 per $1,000 of construction value. If the project value is $2,400,000, what is the building permit fee?

People Also Study

Related Study Resources

Practice More Contractor Exam Questions

Access all practice questions with progress tracking and adaptive difficulty to pass your Florida General Contractor exam.

Start Practicing

Disclaimer: EstatePass is an independent exam preparation platform and is not affiliated with, endorsed by, or connected to any state contractor licensing board, the Construction Industry Licensing Board (CILB), the Department of Business and Professional Regulation (DBPR), NASCLA, Pearson VUE, PSI, or any government agency. Exam requirements, fees, and regulations change frequently. Always verify current requirements with your state's licensing board before making decisions. Information shown was last verified on the dates indicated and may not reflect the most recent changes.