What is the recommended reorder point formula for construction materials with variable demand?

Correct Answer

B) Maximum daily usage × maximum lead time + safety stock

For variable demand situations, the reorder point should account for worst-case scenarios by using maximum daily usage and maximum lead time, plus safety stock to prevent stockouts during demand spikes or delivery delays.

Answer Options
A
Average daily usage × lead time
B
Maximum daily usage × maximum lead time + safety stock
C
Minimum daily usage × average lead time
D
Economic order quantity ÷ 2

Why This Is the Correct Answer

Option B is correct because variable demand construction environments require protection against worst-case scenarios. Using maximum daily usage and maximum lead time ensures materials are available even during peak demand periods and longest delivery delays. The addition of safety stock provides an extra buffer against unexpected demand spikes or supply chain disruptions that are common in construction projects.

Why the Other Options Are Wrong

Option A: Average daily usage × lead time

Option A only uses average values which don't account for demand variability or supply delays, potentially causing stockouts during peak usage periods or extended delivery times.

Option C: Minimum daily usage × average lead time

Option C uses minimum daily usage which would severely underestimate material needs and virtually guarantee stockouts during normal or peak demand periods.

Option D: Economic order quantity ÷ 2

Option D refers to EOQ divided by 2, which is used for determining average inventory levels, not reorder points, and doesn't consider lead time or demand variability.

Memory Technique

Think 'MAX + MAX + SAFETY' - Maximum usage times Maximum lead time plus Safety stock protects against Maximum problems in variable demand situations.

Reference Hint

Construction Project Management or Materials Management chapter in contractor reference manual, specifically inventory control sections

More Business & Finance Questions

People Also Study

Practice More Contractor Exam Questions

Access all practice questions with progress tracking and adaptive difficulty to pass your Florida General Contractor exam.

Start Practicing