Under the Globally Harmonized System (GHS), what information must be included on a Safety Data Sheet (SDS)?
Correct Answer
C) 16 standardized sections
GHS requires Safety Data Sheets to contain 16 standardized sections including identification, hazard identification, composition, first aid measures, and other critical safety information.
Why This Is the Correct Answer
The Globally Harmonized System (GHS) mandates that Safety Data Sheets contain exactly 16 standardized sections to ensure consistent hazard communication worldwide. These 16 sections cover everything from product identification and hazard classification to disposal considerations and regulatory information. This standardization allows workers and emergency responders to quickly locate critical safety information regardless of the chemical manufacturer or country of origin. The 16-section format has been adopted by OSHA and is required for all hazardous chemicals in construction workplaces.
Why the Other Options Are Wrong
Option A: 8 standardized sections
8 sections would be insufficient to cover all the comprehensive safety information required by GHS standards for hazardous chemical communication.
Option B: 12 standardized sections
12 sections falls short of the complete GHS requirement and would not provide adequate standardized safety information coverage.
Option D: 20 standardized sections
20 sections exceeds the GHS standard and would create unnecessary complexity beyond what is required for effective hazard communication.
Memory Technique
Use the mnemonic 'Sweet SixTeen Sections for Safety' - the alliteration of 'S' words helps remember that SDS has 16 sections under GHS.
Reference Hint
Look up OSHA 29 CFR 1926.95 or the Safety chapter covering Hazard Communication Standard (HazCom) and GHS requirements.
More Project Mgmt Questions
What is the minimum R-value required for wall insulation in Florida Climate Zone 2?
A subcontractor brings a new chemical product to your jobsite. Under the Globally Harmonized System (GHS), what information must be immediately available to workers?
A construction site has a trench that is 8 feet deep in Type B soil. What is the maximum allowable slope ratio for the trench walls without protective systems?
A detail drawing shows a scale of 3/4" = 1'-0". If a dimension measures 2.25 inches on the drawing, what is the actual dimension?
What is the maximum recommended spacing between drywall screws when attaching to wood studs?
People Also Study
Business & Financial Management
120 questions · 70% to pass
Contract Administration
60 questions · 70% to pass
Previous Question
According to the Florida Building Code, what is the minimum ceiling height required for habitable rooms in residential construction?
Next Question
During a lockout/tagout procedure, an employee discovers that a machine cannot be fully de-energized due to stored energy in hydraulic accumulators. What additional step is required?